FORMAT
BOOKS
PACKAGES
EDITION
PUBLISHER
CONTENT TYPE
Act
Admin Code
Announcements
Bill
Book
CADD File
CAN
CEU
Charter
Checklist
City Code
Code
Commentary
Comprehensive Plan
Conference Paper
County Code
Course
DHS Documents
Document
Errata
Executive Regulation
Federal Guideline
Firm Content
Guideline
Handbook
Interpretation
Journal
Land Use and Development
Law
Legislative Rule
Local Amendment
Local Code
Local Document
Local Regulation
Local Standards
Manual
Model Code
Model Standard
Notice
Ordinance
Other
Paperback
PASS
Periodicals
PIN
Plan
Policy
Product
Program
Provisions
Requirements
Revisions
Rules & Regulations
Standards
State Amendment
State Code
State Manual
State Plan
State Standards
Statute
Study Guide
Supplement
Technical Bulletin
All
|
Content DescriptionThis specification is a reference specification that the Architect/Engineer can make applicable to any construction project by citing it in the Project Specification. The Architect/Engineer uses and supplements the provisions of this reference specification as needed by designating or specifying individual project requirements to which provisions of this specification apply. This document provides requirements for alternative methods for curing concrete. These alternative methods are not necessarily equal in effectiveness, cost, effect on project schedule, or impact on other aspects of the project. To use this specification, the Architect/Engineer must not only include this document by reference in the Project Specification, but must also identify the concrete elements that are to be cured, and must choose the method to cure those elements. This specification has default settings that may or may not be applicable to a specific project. The Architect/Engineer is to use the Checklists included in this specification to customize the specification to a specific project. Checklists are provided in this document to guide the Architect/Engineer through these selection processes, and the selections must be included in the Project Specification. Alternatively, the Architect/Engineer may allow the Contractor the option of using one or more of a number of permissible curing methods, subject to review and approval. Further, the Architect/Engineer must determine whether deliberate curing efforts are to be terminated after a predetermined time has elapsed, or only after specified concrete properties have developed. When deliberate efforts to cure the concrete are to be terminated only when specified concrete properties have developed, the Architect/Engineer must also select the test method used to measure those properties. This specification addresses curing methods applied after placement of concrete and does not apply to internal curing (use of saturated lightweight aggregate or other materials to provide supplemental water) or to accelerated curing (heat curing). The materials, processes, quality control measures, and inspections described in this document should be tested, monitored, or performed as applicable only by individuals holding the appropriate ACI certifications or equivalent. Keywords: cold-weather concreting; concrete construction; curing; curing films and sheets; hot-weather concreting; insulating concrete; insulation; membrane curing compounds; moist curing; moisture retention; sealers; water curing; water retention.This book also exists in the following packages...About ACIFounded in 1904 and headquartered in Farmington Hills, Michigan, USA, the American Concrete Institute is a leading authority and resource worldwide for the development and distribution of consensus-based standards, technical resources, educational & training programs, certification programs, and proven expertise for individuals and organizations involved in concrete design, construction, and materials, who share a commitment to pursuing the best use of concrete. ACI has over 95 chapters, 110 student chapters, and nearly 20,000 members spanning over 120 countries. |
GROUPS
|