Cart (0)
  • No items in cart.
Total
$0
There is a technical issue about last added item. You can click "Report to us" button to let us know and we resolve the issue and return back to you or you can continue without last item via click to continue button.
Search book title
Enter keywords for book title search
Search book content
Enter keywords for book content search
Filters:
FORMAT
BOOKS
PACKAGES
EDITION
to
PUBLISHER
(1)
(317)
(572)
(44)
(234)
(969)
(643)
(2114)
(64)
(92448)
(54)
(535)
(117)
(31)
(20)
(19)
(92811)
(3)
(17)
(1)
(351)
(300)
(6217)
(239)
(16)
(5)
(1621)
(16)
(18)
(28)
(4)
 
(6)
(7)
(115)
(3)
(57)
(5)
(5)
(1)
(1)
(2)
(23)
(26)
(27)
(13)
(61)
(24)
(22)
(7)
(8)
(20)
(1)
(3)
(50)
(6)
(31)
CONTENT TYPE
 Act
 Admin Code
 Announcements
 Bill
 Book
 CADD File
 CAN
 CEU
 Charter
 Checklist
 City Code
 Code
 Commentary
 Comprehensive Plan
 Conference Paper
 County Code
 Course
 DHS Documents
 Document
 Errata
 Executive Regulation
 Federal Guideline
 Firm Content
 Guideline
 Handbook
 Interpretation
 Journal
 Land Use and Development
 Law
 Legislative Rule
 Local Amendment
 Local Code
 Local Document
 Local Regulation
 Local Standards
 Manual
 Model Code
 Model Standard
 Notice
 Ordinance
 Other
 Paperback
 PASS
 Periodicals
 PIN
 Plan
 Policy
 Product
 Program
 Provisions
 Requirements
 Revisions
 Rules & Regulations
 Standards
 State Amendment
 State Code
 State Manual
 State Plan
 State Standards
 Statute
 Study Guide
 Supplement
 Technical Bulletin
 All
  • BSI
    PD IEC TS 62994:2019 Photovoltaic (PV) modules through the life cycle. Environmental health and safety (EH&S) risk assessment. General principles and nomenclature
    Edition: 2019
    $418.55
    / user per year

Description of PD IEC TS 62994:2019 2019

This document specifies definitions of terms and introduces evaluation methods for EH&S risk assessment for the PV module over the product life cycle. Environmental health and safety (EH&S) risk assessment is a method to characterize and evaluate potential adverse impacts to human health or environment and make it possible to take measures to reduce them. EH&S risk assessment of PV modules is very important for the safe and sustainable manufacture, use, and end of life treatment of PV modules. The definition of terms can be applied to the EH&S risk assessment through the life cycle of PV modules. Generally, evaluation methods for the EH&S risk assessment can be divided in two cases:

  • ordinary foreseen routine operation, in which life cycle assessment method is applied;

  • abnormal non-routine operation, in which risk assessment method is applied.

The scope of the two general cases is described below.

When assessing the environmental impacts of routine operation of PV electricity production with life cycle assessment, the product system includes the manufacturing phase, the use phase and the end of life phase (see Figure 1). Electronic installation, mounting structure and power conversion equipment (such as inverters) are included as part of the PV system to be analysed.

When assessing the risk of non-routine operation of PV modules, the system analysed is limited to the PV module, its supply chain, operation and end of life treatment, and its direct electrical and mechanical interfaces with the balance of system, i.e. the electric installation, mounting structure and inverters.



About BSI

BSI Group, also known as the British Standards Institution is the national standards body of the United Kingdom. BSI produces technical standards on a wide range of products and services and also supplies certification and standards-related services to businesses.

X