Already a subscriber? 

MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?

302.1R-15 Guide to Concrete Floor and Slab Construction, 2015
- MAIN MENU
- TITLE PAGE
- CHAPTER 1—INTRODUCTION [Go to Page]
- 1.1—Purpose
- 1.2—Scope
- CHAPTER 2—DEFINITIONS
- CHAPTER 3—PREBID AND PRECONSTRUCTION MEETINGS [Go to Page]
- 3.1—Prebid meeting
- 3.2—Preconstruction meeting
- CHAPTER 4—CLASSES OF FLOORS [Go to Page]
- 4.1—Classification of floors
- 4.2—Single-course monolithic floors: Classes 1, 2, 4, 5, and 6
- 4.3—Two-course floors: Classes 3, 7, and 8
- 4.4—Class 9 floors
- 4.5—Special finish floors
- CHAPTER 5—DESIGN CONSIDERATIONS [Go to Page]
- 5.1—Scope
- 5.2—Slabs-on-ground
- 5.3—Suspended slabs
- 5.4—Miscellaneous details
- CHAPTER 6—SITE PREPARATION AND PLACING ENVIRONMENT [Go to Page]
- 6.1—Soil-support system preparation
- 6.2—Suspended slabs
- 6.3—Bulkheads
- 6.4—Setting screed guides
- 6.5—Installation of auxiliary materials
- 6.6—Concrete placement conditions
- CHAPTER 7—ASSOCIATED MATERIALS [Go to Page]
- 7.1—Introduction
- 7.2—Reinforcement
- 7.3—Special-purpose aggregates
- 7.4—Monomolecular films
- 7.5—Curing materials
- 7.6—Gloss-imparting waxes
- 7.7—Liquid surface treatments
- 7.8—Joint materials
- 7.9—Volatile organic compounds (VOCs)
- CHAPTER 8—CONCRETE MATERIALS AND MIXTURE PROPORTIONING [Go to Page]
- 8.1—Introduction
- 8.2—Concrete
- 8.3—Concrete properties
- 8.4—Recommended concrete mixture
- 8.5—Aggregates
- 8.6—Portland cement
- 8.7—Water
- 8.8—Admixtures
- 8.9—Concrete mixture analysis
- CHAPTER 9—BATCHING, MIXING, AND TRANSPORTING [Go to Page]
- 9.1—Batching
- 9.2—Mixing
- 9.3—Transporting
- CHAPTER 10—PLACING, CONSOLIDATING, AND FINISHING [Go to Page]
- 10.1—Placing operations
- 10.2—Tools for spreading, consolidating, and finishing
- 10.3—Spreading, consolidating, and finishing operations
- 10.4—Finishing Class 1, 2, and 3 floors
- 10.5—Finishing Class 4 and 5 floors
- 10.6—Finishing Class 6 floors and monolithic-surface treatments for wear resistance
- 10.7—Finishing Class 7 floors
- 10.8—Finishing Class 8 floors (two-course unbonded)
- 10.9—Finishing Class 9 floors
- 10.10—Toppings for precast floors
- 10.11—Finishing lightweight concrete
- 10.12—Nonslip floors
- 10.13—Decorative and nonslip treatments
- 10.14—Grinding as repair procedure
- 10.15—Floor flatness and levelness
- 10.16—Treatment when bleeding is a problem
- 10.17—Delays in cold-weather finishing
- CHAPTER 11—CURING, PROTECTION, AND JOINT FILLING [Go to Page]
- 11.1—Purpose of curing
- 11.2—Methods of curing
- 11.3—Curing at joints
- 11.4—Curing special concrete
- 11.5—Length of curing
- 11.6—Preventing plastic shrinkage cracking
- 11.7—Curing after grinding
- 11.8—Protection of slab during construction
- 11.9—Temperature drawdown in cold storage and freezer rooms
- 11.10—Joint filling and sealing
- CHAPTER 12—QUALITY CONTROL CHECKLIST [Go to Page]
- 12.1—Introduction
- 12.2—Partial list of important items to be observed
- CHAPTER 13—CAUSES OF FLOOR AND SLAB SURFACE IMPERFECTIONS [Go to Page]
- 13.1—Introduction
- 13.2—Random cracking
- 13.3—Low wear resistance
- 13.4—Dusting
- 13.5—Scaling
- 13.6—Popouts
- 13.7—Blisters and delamination
- 13.8—Spalling
- 13.9—Discoloration
- 13.10—Low spots and poor drainage
- 13.11—Slab edge curling
- 13.12—Evaluation of slab surface imperfections
- CHAPTER 14—REFERENCES [Go to Page]
- Authored documents [Go to Page]