Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
ASME B30.8-2020 Floating Cranes and Floating Derricks, 2020
- CONTENTS
- FOREWORD
- ASME B30 COMMITTEE ROSTER
- B30 STANDARD INTRODUCTION
- ASME B30.8-2020 SUMMARY OF CHANGES
- Chapter 8-0: Scope, Definitions, Personnel Competence, Translations, and References [Go to Page]
- SECTION 8-0.1: SCOPE OF ASME B30.8
- SECTION 8-0.2: DEFINITIONS
- SECTION 8-0.3: PERSONNEL COMPETENCE
- SECTION 8-0.4: TRANSLATIONS
- SECTION 8-0.5: REFERENCES
- Chapter 8-1: Construction and Installation [Go to Page]
- SECTION 8-1.1: LOAD RATINGS AND MARKINGS [Go to Page]
- 8-1.1.1 Basis
- 8-1.1.2 Rated Loads
- 8-1.1.3 Rated Load Marking
- SECTION 8-1.2: CONSTRUCTION AND LOADING CONDITIONS [Go to Page]
- 8-1.2.1 Structural Competence
- 8-1.2.2 Operational Criteria
- SECTION 8-1.3: GENERAL REQUIREMENTS FOR PONTOONS AND BARGES [Go to Page]
- 8-1.3.1 Machinery and Electrical Equipment
- 8-1.3.2 Compartments
- 8-1.3.3 Manholes and Hatches
- 8-1.3.4 Fittings
- 8-1.3.5 Life Preservers
- 8-1.3.6 Rescue Skiff
- SECTION 8-1.4: GENERAL REQUIREMENTS FOR CRANES AND DERRICKS [Go to Page]
- 8-1.4.1 Guards
- 8-1.4.2 Lubrication
- 8-1.4.3 Operational Aids
- 8-1.4.4 Miscellaneous Equipment
- SECTION 8-1.5: VERTICAL CLEARANCE
- SECTION 8-1.6: BOOM HOIST (LUFFING HOIST) AND LOAD HOIST MECHANISMS [Go to Page]
- 8-1.6.1 Boom Hoist (Luffing Hoist)
- 8-1.6.2 Load Hoist
- SECTION 8-1.7: SWING MECHANISM [Go to Page]
- 8-1.7.1 Swing Control
- 8-1.7.2 Swing Brake and Locking Device
- SECTION 8-1.8: CONTROLS [Go to Page]
- 8-1.8.1 General
- 8-1.8.2 Power Plant Control
- 8-1.8.3 Control Forces and Movements
- 8-1.8.4 Engine Clutch
- 8-1.8.5 Electric Drive Controls
- 8-1.8.6 Resistors
- 8-1.8.7 Switches
- SECTION 8-1.9: ROPES AND REEVING ACCESSORIES [Go to Page]
- 8-1.9.1 Rope Design Factors
- 8-1.9.2 Ropes: General
- 8-1.9.3 Reeving Accessories
- 8-1.9.4 Sheaves
- 8-1.9.5 Sheave Sizes
- 8-1.9.6 Load Hooks, Ball Assemblies, and Load Blocks
- SECTION 8-1.10: CABS [Go to Page]
- 8-1.10.1 Construction
- 8-1.10.2 Platforms to Cab
- 8-1.10.3 Access to Cab
- 8-1.10.4 Cab Roof
- 8-1.10.5 Exhaust Gases
- SECTION 8-1.11: GENERAL REQUIREMENTS FOR BOOMS [Go to Page]
- 8-1.11.1 Booms
- Chapter 8-2: Inspection, Testing, and Maintenance [Go to Page]
- SECTION 8-2.1: INSPECTION — GENERAL [Go to Page]
- 8-2.1.1 Inspection Classifications
- 8-2.1.2 Frequent Inspection
- 8-2.1.3 Periodic Inspection
- 8-2.1.4 Cranes or Derricks Not in Regular Use
- 8-2.1.5 Inspection Records
- 8-2.1.6 Operational Aids
- SECTION 8-2.2: TESTING [Go to Page]
- 8-2.2.1 Operational Tests
- 8-2.2.2 Load Test
- SECTION 8-2.3: MAINTENANCE [Go to Page]
- 8-2.3.1 Preventive Maintenance
- 8-2.3.2 Maintenance Procedure
- 8-2.3.3 Adjustments and Repairs
- 8-2.3.4 Lubrication
- SECTION 8-2.4: ROPE INSPECTION, REPLACEMENT, AND MAINTENANCE [Go to Page]
- 8-2.4.1 Frequent Inspection
- 8-2.4.2 Periodic Inspection
- 8-2.4.3 Rope Replacement
- 8-2.4.4 Ropes Not in Regular Use
- 8-2.4.5 Inspection Records
- 8-2.4.6 Rope Maintenance
- Chapter 8-3: Operation [Go to Page]
- SECTION 8-3.1: QUALIFICATIONS AND RESPONSIBILITIES
- SECTION 8-3.2: OPERATING PRACTICES
- SECTION 8-3.3: SIGNALS
- SECTION 8-3.4: MISCELLANEOUS
- Figures [Go to Page]
- Figure 8-0.1-1 Floating Crane
- Figure 8-0.1-2 Barge-Mounted Shearleg
- Figure 8-0.1-3 Barge-Mounted Land Crane
- Figure 8-0.1-4 Floating Stiffleg Derrick
- Figure 8-0.1-5 Floating A-Frame Derrick
- Figure 8-0.2-1 Reach for Floating Cranes
- Figure 8-1.9.3-1 Dead-Ending Rope in a Wedge Socket
- Figure 8-2.4.1-1 Core Failure in 19 × 7 Rotation-Resistant Rope
- Figure 8-3.3.2-1 Standard Hand Signals for Controlling Crane and Derrick Operations
- Figure 8-3.4.3-1 Danger Zone for Cranes, Derricks, and Lifted Loads Operating Near Electrical Transmission Lines
- Table [Go to Page]
- Table 8-3.4.3-1 Required Clearance for Normal Voltage in Operation Near High Voltage Power Lines and Operation in Transit With No Load and Boom or Mast Lowered [Go to Page]