PTB-9 ASME Pipeline Standards Compendium, 2014
- Foreword
- 1 INTRODUCTION
- 2 49 CFR 192 – TRANSPORATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS [Go to Page]
- 2.1 Design of Pipeline Components [Go to Page]
- 2.1.1 CFR Reference: 192.147 Flanges and Flange Accessories [Go to Page]
- 2.1.1.1 CFR Language: 192.147(a)
- 2.1.1.2 ASME Standard Reference
- 2.1.1.3 CFR Language: 192.147(c)
- 2.1.1.4 ASME Standard Reference
- 2.1.2 CFR Reference: 192.153 Components Fabricated by Welding [Go to Page]
- 2.1.2.1 CFR Language: 192.153(a)
- 2.1.2.2 ASME Standard Reference
- 2.1.2.3 CFR Language: 192.153(b)
- 2.1.2.4 ASME Standard Reference
- 2.1.2.5 CFR Language: 192.153(d)
- 2.1.2.6 ASME Standard Reference
- 2.1.3 CFR Reference: 192.165 Compressor Stations: Liquid Removal [Go to Page]
- 2.1.3.1 CFR Language: 192.165(b)(3)
- 2.1.3.2 ASME Standard Reference
- 2.2 Welding of Steel in Pipelines [Go to Page]
- 2.2.1 CFR Reference: 192.227 Qualification of Welders [Go to Page]
- 2.2.1.1 CFR Language: 192.227(a)
- 2.2.1.2 ASME Standard Reference
- 2.3 Joining of Materials Other Than by Welding [Go to Page]
- 2.3.1 CFR Reference: 192.279 Copper Pipe [Go to Page]
- 2.3.1.1 CFR Language: 192.279
- 2.3.1.2 ASME Standard Language
- 2.4 Requirements for Corrosion Control [Go to Page]
- 2.4.1 CFR Reference: 192.485 Remedial Measures: Transmission Lines [Go to Page]
- 2.4.1.1 CFR Language: 192.485(c)
- 2.4.1.2 ASME Standard Reference
- 2.5 Operations [Go to Page]
- 2.5.1 CFR Reference: 192.619 What is the Maximum Allowable Operating Pressure for Steel or Plastic Pipelines? [Go to Page]
- 2.5.1.1 CFR Language: 192.619(a)(1)(i)
- 2.5.1.2 ASME Standard Language [Go to Page]
- 2.5.1.2.1 Recommended Practice for Hydrostatic Testing of Pipelines in Place (B31.8 - Nonmandatory Appendix N) [Go to Page]
- 2.5.1.2.1.1 Introduction (B31.8 - N-1)
- 2.5.1.2.1.2 Planning (B31.8 - N-2)
- 2.5.1.2.1.3 Filling (B31.8 - N-3)
- 2.5.1.2.1.4 Testing (B31.8 - N-4)
- 2.5.1.2.1.5 Determination of Pressure Required to Produce Yielding (B31.8 - N-5)
- 2.5.1.2.1.6 Leak Testing (B31.8 - N-6)
- 2.5.1.2.1.7 Records (B31.8 - N-7)
- 2.6 Gas Transmission Pipeline Integrity Management [Go to Page]
- 2.6.1 CFR Reference: 192.903 What Definitions Apply to this Subpart? [Go to Page]
- 2.6.1.1 CFR Language: 192.903(c)
- 2.6.1.2 ASME Standard Language [Go to Page]
- 2.6.1.2.1 Consequences (B31.8S - 3) [Go to Page]
- 2.6.1.2.1.1 General (B31.8S - 3.1)
- 2.6.1.2.1.2 Potential Impact Area (B31.8S - 3.2)
- 2.6.1.2.1.3 Consequence Factors to Consider (B31.8S - 3.3)
- 2.6.2 CFR Reference: 192.907 What Must an Operator Do to Implement this Subpart? [Go to Page]
- 2.6.2.1 CFR Language: 192.907(b)
- 2.6.2.2 ASME Standard Language [Go to Page]
- 2.6.2.2.1 Scope (B31.8S – 1.1)
- 2.6.3 CFR Reference: 192.911 What Are the Elements of an Integrity Management Program? [Go to Page]
- 2.6.3.1 CFR Language: 192.911, 192.911(i), 192.911(k), 192.911(l), 192.911(m)
- 2.6.3.2 ASME Standard Language [Go to Page]
- 2.6.3.2.1 Performance Plan (B31.8S – 9) [Go to Page]
- 2.6.3.2.1.1 Introduction (B31.8S - 9.1)
- 2.6.3.2.1.2 Performance Measures Characteristics (B31.8S - 9.2)
- 2.6.3.2.1.3 Performance Measurement Methodology (B31.8S - 9.3)
- 2.6.3.2.1.4 Performance Measurement: Intrasystem (B31.8S - 9.4)
- 2.6.3.2.1.5 Performance Measurement: Industry Based (B31.8S - 9.5)
- 2.6.3.2.1.6 Performance Improvement (B31.8S - 9.6)
- 2.6.3.2.2 Communication Plan (B31.8S - 10) [Go to Page]
- 2.6.3.2.2.1 General (B31.8S - 10.1)
- 2.6.3.2.2.2 External Communications (B31.8S - 10.2)
- 2.6.3.2.2.3 Internal Communications (B31.8S - 10.3)
- 2.6.3.2.3 Management of Change Plan (B31.8S - 11)
- 2.6.3.2.4 Quality Control Plan (B31.8S - 12) [Go to Page]
- 2.6.3.2.4.1 General (B31.8S - 12.1)
- 2.6.3.2.4.2 Quality Management Control (B31.8S - 12.2)
- 2.6.4 CFR Reference: 192.913 When May an Operator Deviate its Program from Certain Requirements of this Subpart? [Go to Page]
- 2.6.4.1 CFR Language: 192.913(a), 192.913(b)(1)
- 2.6.4.2 ASME Standard Language
- 2.6.5 CFR Reference: 192.917 How Does an Operator Identify Potential Threats to Pipeline Integrity and Use the Threat Identification in its Integrity Program? [Go to Page]
- 2.6.5.1 CFR Language 192.917(a)
- 2.6.5.2 ASME Standard Language [Go to Page]
- 2.6.5.2.1 Integrity Management Program Overview (B31.8S - 2) [Go to Page]
- 2.6.5.2.1.1 General (B31.8S - 2.1)
- 2.6.5.2.1.2 Integrity Threat Classification (B31.8S - 2.2)
- 2.6.5.2.1.3 The Integrity Management Process (B31.8S - 2.3)
- 2.6.5.2.1.4 Integrity Management Program (B31.8S - 2.4)
- 2.6.5.2.2 Integrity Assessment (B31.8S - 6) [Go to Page]
- 2.6.5.2.2.1 General (B31.8S – 6.1)
- 2.6.5.2.2.2 Pipeline In-Line Inspection (B31.8S – 6.2)
- 2.6.5.2.2.3 Pressure Testing (B31.8S – 6.3)
- 2.6.5.2.2.4 Direct Assessment (B31.8S – 6.4)
- 2.6.5.2.2.5 Other Integrity Assessment Methodologies (B31.8S - 6.5)
- 2.6.5.2.3 Integrity Management Plan (B31.8S - 8) [Go to Page]
- 2.6.5.2.3.1 General (B31.8S - 8.1)
- 2.6.5.2.3.2 Updating the Plan (B31.8S – 8.2)
- 2.6.5.2.3.3 Plan Framework (B31.8S – 8.3)
- 2.6.5.3 CFR Language: 192.917(b)
- 2.6.5.4 ASME Standard Language [Go to Page]
- 2.6.5.4.1 Gathering, Reviewing, and Integrating Data (B31.8S - 4) [Go to Page]
- 2.6.5.4.1.1 General (B31.8S - 4.1)
- 2.6.5.4.1.2 Data Requirements (B31.8S - 4.2)
- 2.6.5.4.1.3 Data Sources (B31.8S - 4.3)
- 2.6.5.4.1.4 Data Collection, Review, and Analysis (B31.8S - 4.4)
- 2.6.5.4.1.5 Data Integration (B31.8S - 4.5)
- 2.6.5.4.2 Threat Process Charts and Prescriptive Integrity Management Plans (B31.8S Nonmandatory Appendix A) [Go to Page]
- 2.6.5.4.2.1 External Corrosion Threat (B31.8S - A-1) [Go to Page]
- 2.6.5.4.2.1.1. Scope (B31.8S – A-1.1)
- 2.6.5.4.2.1.2. Gathering, Reviewing, and Integrating Data (B31.8S – A-1.2)
- 2.6.5.4.2.1.3. Criteria and Risk Assessment (B31.8S – A-1.3)
- 2.6.5.4.2.1.4. Integrity Assessment (B31.8S – A-1.4)
- 2.6.5.4.2.1.5. Responses and Mitigation (B31.8S – A-1.5)
- 2.6.5.4.2.1.6. Other Data (B31.8S – A-1.6)
- 2.6.5.4.2.1.7. Assessment Interval (B31.8S – A-1.7)
- 2.6.5.4.2.1.8. Performance Measures (B31.8S – A-1.8)
- 2.6.5.4.2.2 Internal Corrosion Threat (B31.8S – A-2) [Go to Page]
- 2.6.5.4.2.2.1. Scope (B31.8S – A-2.1)
- 2.6.5.4.2.2.2. Gathering, Reviewing, and Integrating Data (B31.8S – A-2.2)
- 2.6.5.4.2.2.3. Criteria and Risk Assessment (B31.8S – A-2.3)
- 2.6.5.4.2.2.4. Integrity Assessment (B31.8S – A-2.4)
- 2.6.5.4.2.2.5. Responses and Mitigation (B31.8S – A-2.5)
- 2.6.5.4.2.2.6. Other Data (B31.8S – A-2.6)
- 2.6.5.4.2.2.7. Assessment Interval (B31.8S – A-2.7)
- 2.6.5.4.2.2.8. Performance Metrics (B31.8S – A-2.8)
- 2.6.5.4.2.3 Stress Corrosion Cracking Threat (B31.8S – A-3) [Go to Page]
- 2.6.5.4.2.3.1. Scope (B31.8S – A-3.1)
- 2.6.5.4.2.3.2. Gathering, Reviewing, and Integrating Data (B31.8S – A-3.2)
- 2.6.5.4.2.3.3. Criteria and Threat Assessment (B31.8S – A-3.3)
- 2.6.5.4.2.3.4. Integrity Assessment (B31.8S – A-3.4)
- 2.6.5.4.2.3.5. Other Data (B31.8S – A-3.5)
- 2.6.5.4.2.3.6. Performance Measures (B31.8S – A-3.6)
- 2.6.5.4.2.4 Manufacturing Threat (Pipe Seam and Pipe) (B31.8S – A-4) [Go to Page]
- 2.6.5.4.2.4.1. Scope (B31.8S – A-4.1)
- 2.6.5.4.2.4.2. Gathering, Reviewing, and Integrating Data (B31.8S – A-4.2)
- 2.6.5.4.2.4.3. Criteria and Risk Assessment (B31.8S – A-4.3)
- 2.6.5.4.2.4.4. Integrity Assessment (B31.8S – A-4.4)
- 2.6.5.4.2.4.5. Responses and Mitigation (B31.8S – A-4.5)
- 2.6.5.4.2.4.6. Other Data (B31.8S – A-4.6)
- 2.6.5.4.2.4.7. Assessment Interval (B31.8S – A-4.7)
- 2.6.5.4.2.4.8. Performance Measures (B31.8S – A-4.8)
- 2.6.5.4.2.5 Construction Threat (Pipe Girth Weld, Fabrication Weld, Wrinkle Bend or Buckle, Stripped Threads/Broken Pipe/ Coupling) (B31.8S – A-5) [Go to Page]
- 2.6.5.4.2.5.1. Scope (B31.8S – A-5.1)
- 2.6.5.4.2.5.2. Gathering, Reviewing, and Integrating Data (B31.8S – A-5.2)
- 2.6.5.4.2.5.3. Criteria and Risk Assessment (B31.8S – A-5.3)
- 2.6.5.4.2.5.4. Integrity Assessment (B31.8S – A-5.4)
- 2.6.5.4.2.5.5. Responses and Mitigation (B31.8S – A-5.5)
- 2.6.5.4.2.5.6. Other Data (B31.8S – A-5.6)
- 2.6.5.4.2.5.7. Assessment Interval (B31.8S – A-5.7)
- 2.6.5.4.2.5.8. Performance Measures (B31.8S – A-5.8)
- 2.6.5.4.2.6 Equipment Threat (Gaskets and O-Rings, Control/Relief, Seal/Pump Packing) (B31.8S – A-6) [Go to Page]
- 2.6.5.4.2.6.1. Scope (B31.8S – A-6.1)
- 2.6.5.4.2.6.2. Gathering, Reviewing, and Integrating Data (B31.8S – A-6.2)
- 2.6.5.4.2.6.3. Criteria and Risk Assessment (B31.8S – A-6.3)
- 2.6.5.4.2.6.4. Integrity Assessment (B31.8S – A-6.4)
- 2.6.5.4.2.6.5. Responses and Mitigation (B31.8S – A-6.5)
- 2.6.5.4.2.6.6. Other Data (B31.8S – A-6.6)
- 2.6.5.4.2.6.7. Assessment Interval (B31.8S – A-6.7)
- 2.6.5.4.2.6.8. Performance Measures (B31.8S – A-6.8)
- 2.6.5.4.2.7 Third-Party Damage Threat [Third-Party Inflicted Damage (Immediate), Vandalism, Previously Damaged Pipe] (B31.8S – A-7) [Go to Page]
- 2.6.5.4.2.7.1. Scope (B31.8S – A-7.1)
- 2.6.5.4.2.7.2. Gathering, Reviewing, and Integrating Data (B31.8S – A-7.2)
- 2.6.5.4.2.7.3. Criteria and Risk Assessment (B31.8S – A-7.3)
- 2.6.5.4.2.7.4. Integrity Assessment (B31.8S – A-7.4)
- 2.6.5.4.2.7.5. Responses and Mitigation (B31.8S – A-7.5)
- 2.6.5.4.2.7.6. Other Data (B31.8S – A-7.6)
- 2.6.5.4.2.7.7. Assessment Interval (B31.8S – A-7.7)
- 2.6.5.4.2.7.8. Performance Measures (B31.8S – A-7.8)
- 2.6.5.4.2.8 Incorrect Operations Threat (B31.8S – A-8) [Go to Page]
- 2.6.5.4.2.8.1. Scope (B31.8S – A-8.1)
- 2.6.5.4.2.8.2. Gathering, Reviewing, and Integrating Data (B31.8S – A-8.2)
- 2.6.5.4.2.8.3. Criteria and Risk Assessment (B31.8S – A-8.3)
- 2.6.5.4.2.8.4. Integrity Assessment (B31.8S – A-8.4)
- 2.6.5.4.2.8.5. Responses and Mitigation (B31.8S – A-8.5)
- 2.6.5.4.2.8.6. Other Data (B31.8S – A-8.6)
- 2.6.5.4.2.8.7. Assessment Interval (B31.8S – A-8.7)
- 2.6.5.4.2.8.8. Performance Measures (B31.8S – A-8.8)
- 2.6.5.4.2.9 Weather-Related and Outside Force Threat (Earth Movement, Heavy Rains or Floods, Cold Weather, Lightning) (B31.8S – A-9) [Go to Page]
- 2.6.5.4.2.9.1. Scope (B31.8S – A-9.1)
- 2.6.5.4.2.9.2. Gathering, Reviewing, and Integrating Data (B31.8S – A-9.2)
- 2.6.5.4.2.9.3. Criteria and Risk Assessment (B31.8S – A-9.3)
- 2.6.5.4.2.9.4. Integrity Assessment (B31.8S – A-9.4)
- 2.6.5.4.2.9.5. Responses and Mitigation (B31.8S – A-9.5)
- 2.6.5.4.2.9.6. Other Data (B31.8S – A-9.6)
- 2.6.5.4.2.9.7. Assessment Interval (B31.8S – A-9.7)
- 2.6.5.4.2.9.8. Performance Measures (B31.8S – A-9.8)
- 2.6.5.5 CFR Language: 192.917(c)
- 2.6.5.6 ASME Standard Language [Go to Page]
- 2.6.5.6.1 Risk Assessment (B31.8S - 5) [Go to Page]
- 2.6.5.6.1.1 Introduction (B31.8S - 5.1)
- 2.6.5.6.1.2 Definition (B31.8S - 5.2)
- 2.6.5.6.1.3 Risk Assessment Objectives (B31.8S - 5.3)
- 2.6.5.6.1.4 Developing a Risk Assessment Approach (B31.8S - 5.4)
- 2.6.5.6.1.5 Risk Assessment Approaches (B31.8S - 5.5)
- 2.6.5.6.1.6 Risk Analysis (B31.8S - 5.6)
- 2.6.5.6.1.7 Characteristics of an Effective Risk Assessment Approach (B31.8S - 5.7)
- 2.6.5.6.1.8 Risk Estimates Using Assessment Methods (B31.8S - 5.8)
- 2.6.5.6.1.9 Data Collection for Risk Assessment (B31.8S - 5.9)
- 2.6.5.6.1.10 Prioritization for Prescriptive-Based and Performance-Based Integrity Management Programs (B31.8S - 5.10)
- 2.6.5.6.1.11 Integrity Assessment and Mitigation (B31.8S - 5.11)
- 2.6.5.6.1.12 Validation (B31.8S - 5.12)
- 2.6.5.7 CFR Language: 192.917(e)(1)
- 2.6.5.8 ASME Standard Language
- 2.6.5.9 CFR Language: 192.917(e)(4)
- 2.6.5.10 ASME Standard Language
- 2.6.6 CFR Reference: 192.921 How is the Baseline Assessment to be Conducted? [Go to Page]
- 2.6.6.1 CFR Language: 192.921(a)(1)
- 2.6.6.2 ASME Standard Language:
- 2.6.7 CFR Reference: 192.923 How is Direct Assessment Used and for What Threats? [Go to Page]
- 2.6.7.1 CFR Language: 192.923(b)(1)
- 2.6.7.2 ASME Standard Language
- 2.6.7.3 CFR Language: 192.923(b)(2)
- 2.6.7.4 ASME Standard Language [Go to Page]
- 2.6.7.4.1 Internal Corrosion Direct Assessment (B31.8S – B2)
- 2.6.7.5 CFR Language: 192.923(b)(3)
- 2.6.7.6 ASME Standard Language
- 2.6.8 CFR Reference: 192.925 What are the Requirements for Using External Corrosion Direct Assessment (ECDA)? [Go to Page]
- 2.6.8.1 CFR Language: 192.925(b) Introductory text
- 2.6.8.2 ASME Standard Language
- 2.6.8.3 CFR Language: 192.925(b)(1)
- 2.6.8.4 ASME Standard Language
- 2.6.8.5 CFR Language: 192.925(b)(2)
- 2.6.8.6 ASME Standard Language
- 2.6.8.7 CFR Language: 192.925(b)(3)
- 2.6.8.8 ASME Standard Language
- 2.6.8.9 CFR Language: 192.925(b)(4)
- 2.6.8.10 ASME Standard Language
- 2.6.9 CFR Reference: 192.927 What are the Requirements for Using Internal Corrosion Direct Assessment (ICDA)? [Go to Page]
- 2.6.9.1 CFR Language: 192.927(b)
- 2.6.9.2 ASME Standard Language
- 2.6.9.3 CFR Language: 192.927(c)(1)(i)
- 2.6.9.4 ASME Standard Language
- 2.6.10 CFR Reference: 192.929 What are the Requirements for Using Direct Assessment for Stress Corrosion Cracking (SCCDA)? [Go to Page]
- 2.6.10.1 CFR Language: 192.929(b)(2)
- 2.6.10.2 ASME Standard Language
- 2.6.11 CFR Reference: 192.933 What Actions Must Be Taken to Address Integrity Issues? (192.933(a), (d)(1), (d)(1)(i)) [Go to Page]
- 2.6.11.1 CFR Language: 192.933(a)
- 2.6.11.2 ASME Standard Reference
- 2.6.11.3 CFR Language
- 2.6.11.4 ASME Standard Language
- 2.6.11.5 CFR Language: 192.933(d)(1)
- 2.6.11.6 ASME Standard Language [Go to Page]
- 2.6.11.6.1 Responses to Integrity Assessments and Mitigation (Repair and Prevention) (B31.8S –7) [Go to Page]
- 2.6.11.6.1.1 General (B31.8S –7.1)
- 2.6.11.6.1.2 Responses to Pipeline In-Line Inspections (B31.8S - 7.2)
- 2.6.11.6.1.3 Responses to Pressure Testing (B31.8S - 7.3)
- 2.6.11.6.1.4 Responses to Direct Assessment Inspections (B31.8S - 7.4)
- 2.6.11.6.1.5 Timing for Scheduled Responses (B31.8S - 7.5)
- 2.6.11.6.1.6 Repair Methods (B31.8S - 7.6)
- 2.6.11.6.1.7 Prevention Strategy/Methods (B31.8S - 7.7)
- 2.6.11.6.1.8 Prevention Options (B31.8S - 7.8)
- 2.6.11.7 CFR Language: 192.933(d)(1)(i)
- 2.6.11.8 ASME Standard Language
- 2.6.12 CFR Reference: 192.935 What Additional Preventive and Mitigative Measures Must an Operator Take? [Go to Page]
- 2.6.12.1 CFR Language: 192.935(a)
- 2.6.12.2 ASME Standard Language
- 2.6.12.3 CFR Language: 192.935(b)(1)(iv)
- 2.6.12.4 ASME Standard Language
- 2.6.13 CFR Reference: 192.937 What is a Continual Process of Evaluation and Assessment to Maintain a Pipeline’s Integrity? [Go to Page]
- 2.6.13.1 CFR Language: 192.937(c)(1)
- 2.6.13.2 ASME Standard Language
- 2.6.14 CFR Reference: 192.939 What are the Required Reassessment Intervals? [Go to Page]
- 2.6.14.1 CFR Language: 192.939(a)(1)(i)
- 2.6.14.2 ASME Standard Language
- 2.6.14.3 CFR Language: 192.939(a)(1)(ii)
- 2.6.14.4 ASME Standard Language
- 2.6.14.5 CFR Language: 192.933(a)(3)
- 2.6.14.6 ASME Standard Language
- 2.6.15 CFR Reference: 192.945 What Methods Must an Operator Use to Measure Program Effectiveness? [Go to Page]
- 2.6.15.1 CFR Language: 192.945(a)
- 2.6.15.2 ASME Standard Language
- 2.7 Appendix [Go to Page]
- 2.7.1 CFR Reference: Item II, Appendix B to Part 192 [Go to Page]
- 2.7.1.1 CFR Language: Item II, Appendix B to Part 192
- 2.7.1.2 ASME Standard Reference:
- 3 49 CFR 193 – LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS [Go to Page]
- 3.1 Construction [Go to Page]
- 3.1.1 CFR Reference: 193.2321 Nondestructive Tests [Go to Page]
- 3.1.1.1 CFR Language: 193.2321(a)
- 3.1.1.2 ASME Standard Reference
- 4 49 CFR 195 – TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE [Go to Page]
- 4.1 General [Go to Page]
- 4.1.1 CFR Reference: 195.5 Conversion to Service Subject to This Part [Go to Page]
- 4.1.1.1 CFR Language: 195.5(a)(1)(i)
- 4.1.1.2 ASME Standard Reference
- 4.2 Design Requirements [Go to Page]
- 4.2.1 CFR Reference: 195.118 Fittings [Go to Page]
- 4.2.1.1 CFR Language: 195.118(a)
- 4.2.1.2 ASME Standard Reference
- 4.2.2 CFR Reference: 195.124 Closures [Go to Page]
- 4.2.2.1 CFR Language: 195.124
- 4.2.2.2 ASME Standard Reference
- 4.3 Construction [Go to Page]
- 4.3.1 CFR Reference: 195.222 Welders: Qualification of Welders [Go to Page]
- 4.3.1.1 CFR Language: 195.222(a)
- 4.3.1.2 ASME Standard Reference
- 4.4 Pressure Testing [Go to Page]
- 4.4.1 CFR Reference: 195.307 Pressure Testing Aboveground Breakout Tanks [Go to Page]
- 4.4.1.1 CFR Language: 195.307(e)
- 4.4.1.2 ASME Standard Reference
- 4.5 Operation and Maintenance [Go to Page]
- 4.5.1 CFR Reference: 195.406 Maximum Operating Pressure [Go to Page]
- 4.5.1.1 CFR Language: 195.406(a)(1)(i)
- 4.5.1.2 ASME Standard Reference
- 4.5.2 CFR Reference: 195.452 Pipeline Integrity Management in High Consequence Areas [Go to Page]
- 4.5.2.1 CFR Language: 195.452(h)(4)(i), 195.452(h)(4)(i)(B)
- 4.5.2.2 ASME Standard Reference [Go to Page]
- 4.5.2.2.1 Limits and Disposition of Imperfections and Anomalies (B31.4 – 451.6.2) [Go to Page]
- 4.5.2.2.1.1 Limits (B31.4 – 451.6.2.1)
- 4.5.2.2.1.2 Corrosion (B31.4 – 451.6.2.2)
- 4.5.2.3 CFR Language: 195.452(h)(4)(iii)(D)
- 4.5.2.4 ASME Standard Reference
- Appendix A – Descriptions of Referenced ASME Standards [Go to Page]