Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
BS EN 62952-3:2017 Power sources for a wireless communication device - Generic energy harvesting adapter module, 2017
- National foreword
- English [Go to Page]
- CONTENTS
- FOREWORD
- INTRODUCTION
- 1 Scope
- 2 Normative references
- 3 Terms, definitions, abbreviated terms, acronyms and conventions [Go to Page]
- 3.1 Terms and definitions
- 3.2 Abbreviated terms and acronyms
- 3.3 Convention for capitalizations
- 3.4 Convention for profiles
- Tables [Go to Page]
- Table 1 – Layout of profile (sub)clause selection tables
- Table 2 – Contents of (sub)clause selection tables
- 4 Specific requirements for power sources with energy harvesting [Go to Page]
- 4.1 General
- 4.2 GEHAM and energy harvester
- 4.3 Mechanical requirements [Go to Page]
- 4.3.1 Connector
- 4.3.2 Flying lead
- 4.3.3 Cable specification
- 4.3.4 Enclosure shape
- 4.4 Electrical characteristics [Go to Page]
- 4.4.1 General
- 4.4.2 Input rating of GEHAM
- 4.4.3 Output rating of GEHAM
- 4.4.4 Protections
- 4.5 Communication interface
- 5 Profile for power modules with energy harvesting [Go to Page]
- Table 3 – General power module profile selection
- Table 4 – Power Module Type C profile selection
- Annex A (informative) Mechanical options
- Figures [Go to Page]
- Figure A.1 – Option 1: Fixed connection on energy harvester, connector on GEHAM
- Figure A.2 – Option 2: Connectors on both energy harvester and GEHAM
- Figure A.3 – Option 3: Cable fixed on energy harvester, Flying Lead to GEHAM
- Figure A.4 – Option 4: Connector on energy harvester end, Flying Lead connection to GEHAM
- Figure A.5 – Option 5: Flying-lead interface on energy harvester, flying-lead interface on GEHAM side
- Figure A.6 – GEHAM is inside, energy harvester is outside of WCD
- Figure A.7 – GEHAM and energy harvester are outside of WCD, it supplies to built-in power source
- Annex B (normative) Cable and connector specification [Go to Page]
- B.1 General requirements
- Figure B.1 – M12 male
- B.2 Pin 1, Ground
- B.3 Pin 2, Digital communication interface
- Figure B.2 – M12 female
- Figure B.3 – Flying lead
- B.4 Pin 3, DC power (positive)
- B.5 Pin 4, Sense
- B.6 Pin 5, Reserved
- Bibliography [Go to Page]