Already a subscriber? 

MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?

BS EN IEC 61472-2:2021 Live working. Minimum approach distances - Method of determination of the electrical component distance for AC systems from 1,0 kV to 72,5 kV, 2021
- undefined [Go to Page]
- European foreword
- Endorsement notice
- English [Go to Page]
- CONTENTS
- FOREWORD
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Minimum approach distance, DA
- 5 Factors influencing the minimum approach distance [Go to Page]
- 5.1 Control of system overvoltages
- 5.2 Statistical overvoltage
- 5.3 Conductive floating object
- 5.4 Insulators
- 5.5 Determination of minimum electrical distance, DU
- 6 Example calculation
- Table 1 – Distance for rod-to-rod gap from IEEE 516-2009
- Table 2 – Phase-to-earth electrical distance for system voltagesfrom 1,0 kV up to and including 72,5 kV, ue2 = 3,5
- Table 3 – Phase-to-phase electrical distances for system voltagesfrom 1,0 kV up to and including 72,5 kV, up2 = 5,2
- Annex A (informative)Overvoltages [Go to Page]
- A.1 General
- A.2 Highest voltage of a system
- A.3 Temporary overvoltage
- A.4 Transient overvoltage [Go to Page]
- A.4.1 General
- A.4.2 Switching overvoltage
- A.4.3 Lightning overvoltages
- Annex B (informative)Ergonomic considerations [Go to Page]
- B.1 General
- B.2 Training, knowledge and skill
- B.3 Protective barriers
- B.4 Possibility of error
- B.5 Work procedure
- B.6 Personal factors
- B.7 Monitoring
- Bibliography [Go to Page]