Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
BS ISO/IEC 14763-4:2021 Information technology. Implementation and operation of customer premises cabling - Measurement of end-to-end (E2E) links, modular plug terminated links (MPTLs) and direct attach cabling, 2021
- undefined
- CONTENTS
- FOREWORD
- INTRODUCTION
- 1 Scope
- 2 Normative references
- 3 Terms, definitions and abbreviated terms [Go to Page]
- 3.1 Terms and definitions
- 3.2 Abbreviated terms
- 4 Conformance
- 5 Transmission performance of E2E links, MPTLs and direct attach cabling
- 6 Transmission limits of E2E link, MPTLs and direct attach cabling
- Tables [Go to Page]
- Table 1 – Transmission performance limits
- 7 Reference planes of E2E link, MPTL and direct attach cabling [Go to Page]
- 7.1 Reference planes of E2E link
- 7.2 Reference planes of MPTL
- Figures [Go to Page]
- Figure 1 – Reference planes of E2E links
- 7.3 Reference planes of direct attach cabling
- Figure 2 – Reference planes of 2-connection MPTL
- Figure 3 – Reference planes of 3-connection MPTL
- 8 Testing [Go to Page]
- 8.1 General
- 8.2 Laboratory testing of E2E link, MPTL and direct attach cabling
- 8.3 Field testing of E2E link, MPTL and direct attach cabling [Go to Page]
- 8.3.1 Basic criteria
- Figure 4 – Reference planes of direct attach cabling [Go to Page]
- 8.3.2 Requirements of field test equipment
- 8.3.3 Field test measurement parameters
- 9 Test head requirements [Go to Page]
- 9.1 General
- 9.2 Additional test head requirements in accordance with the IEC 60603-7 series
- Table 2 – Overview level for field test equipment of performance of E2E link, direct attach cabling and MPTLs
- 9.3 Test head requirements of IEC 61076-2-101
- 9.4 Test head requirements of IEC 61076-2-109
- Annex A (informative)Example performance of E2E link test heads [Go to Page]
- A.1 Example Category 5 test head performance
- A.2 Example Category 6 test head performance
- Table A.1 – Example performance of free connector de-embedded NEXT for Category 5 E2E test heads in the frequency range 50 MHz ≤ f < 100 MHz
- Table A.2 – Example performance of free connector de-embedded NEXT for Category 6 E2E test heads in the frequency range 50 MHz ≤ f < 250 MHz
- Annex B (normative)Test regime for reference performance and installation performance of E2E link, MPTL and direct attach cabling [Go to Page]
- Table B.1 – Reference Classes of E2E link, direct attach cabling and MPTL
- Table B.2 – Test regime for reference performance and installationperformance of E2E link, direct attach cabling and MPTL
- Bibliography [Go to Page]