PD 6079-4:2006 (Book) Project management - Guide to project management in the construction industry, 2006
- Contents [Go to Page]
- Introduction 1
- 1 Scope 3
- 2 Normative references 3
- 3 Terms and definitions 4
- 4 Project management in the construction industry 6
- 4.1 General 6
- 4.2 The construction industry and construction industry projects 6
- 4.3 Projects and project management 9
- 5 The project management plan (PMP) 11
- 5.1 General 11
- 5.2 Quality management in projects 12
- 5.3 The components of a project management system 14
- 5.4 Project processes 16
- 5.5 Hierarchy of plans 20
- 6 Scope definition and scope-related processes 25
- 6.1 General 25
- 6.2 Inception - Client requirements and constraints 25
- 6.3 Stakeholder requirements and constraints 27
- 6.4 Feasibility evaluation and the project brief 27
- 6.5 Scope development and control 28
- 6.6 Work breakdown structure 28
- 6.7 Control of activities 30
- 6.8 Change management 30
- 6.9 Configuration management 31
- 7 Project organization structure 32
- 7.1 General 32
- 7.2 Internal client project organization 32
- 7.3 Project organization 36
- 7.4 Management authority 36
- 7.5 Communication 37
- 7.6 Contractual relationships 37
- 7.7 Resource management 37
- 8 The project lifecycle 37
- 8.1 General 37
- 8.2 Project phases 39
- 8.3 Control points 39
- 9 The product delivery process 40
- 9.1 General 40
- 9.2 Initiation 43
- 9.3 Feasibility 43
- 9.4 Outline design 43
- 9.5 Scheme design 44
- 9.6 Detailed design 45
- 9.7 Mobilization 45
- 9.8 Construction 46
- 9.9 Commissioning 46
- 9.10 Handover and completion 47
- 10 Regulatory and enabling processes 48
- 10.1 General 48
- 10.2 Design principles and materials standards 48
- 10.3 Client and project-specific third-party approval 49
- 10.4 Standard operating policies 49
- 10.5 Funding 49
- 10.6 Management of regulatory and enabling processes 50
- 11 Project management control processes 51
- 11.1 General 51
- 11.2 Management responsibility 52
- 11.3 Resource management 56
- 11.4 Time-related processes 58
- 11.5 Cost-related processes 60
- 11.6 Communication-related processes 61
- 11.7 Risk-related processes 63
- 11.8 Procurement-related processes 64
- 11.9 Project and process closure 66
- 11.10 Measurement, analysis and improvement 66
- Foreword
- Introduction [Go to Page]
- Figure 1 Structure of PD 6079-4
- 1 Scope
- 2 Normative references
- 3 Terms and definitions [Go to Page]
- 3.1 client
- 3.2 change management
- 3.3 configuration management
- 3.4 construction management
- 3.5 contract administration
- 3.6 contract administrator
- 3.7 control point
- 3.8 framework agreement
- 3.9 operator
- 3.10 partnering
- 3.11 product
- 3.12 project
- 3.13 project control
- 3.14 project process
- 3.15 project schedule
- 3.16 project team
- 3.17 stakeholder
- 3.18 subproject
- 3.19 supplier
- 4 Project management in the construction industry [Go to Page]
- 4.1 General
- 4.2 The construction industry and construction industry projects [Go to Page]
- 4.2.1 Characteristics on the construction industry [Go to Page]
- Table 1 Characteristics of the construction industry
- Figure 2 The project management triangle
- 4.2.2 Custom and practice
- 4.2.3 The project environment [Go to Page]
- Figure 3 Interaction between the immediate and wider project environments
- 4.3 Projects and project management [Go to Page]
- 4.3.1 Construction projects [Go to Page]
- Figure 4 Projects and subprojects
- 4.3.2 The role of the project manager
- 4.3.3 Attributes of the project manager [Go to Page]
- a) leadership;
- b) technological understanding;
- c) evaluation and decision-making skills;
- d) people management skills;
- e) systems design and maintenance skills;
- f) planning and control skills;
- g) financial awareness;
- h) buying and general procurement skills;
- i) communication skills;
- j) negotiation skills;
- k) contractual skills;
- l) legal awareness;
- m) character;
- n) project team building skills;
- o) relevant experience;
- p) social and environmental awareness.
- 5 The project management plan (PMP) [Go to Page]
- 5.1 General [Go to Page]
- Figure 5 Integrated management plan
- 5.2 Quality management in projects [Go to Page]
- Figure 6 Project lifecycle and control points
- 5.3 The components of a project management system [Go to Page]
- Figure 7 The components of a project management system
- Figure 8 Variable and fixed project processes
- 5.4 Project processes [Go to Page]
- Figure 9 Management processes
- Figure 10 Project management plan
- Figure 11 The time relationship between the product delivery processes and regulatory and enabling processes
- 5.5 Hierarchy of plans [Go to Page]
- Figure 12 Hierarchy of management plans [Go to Page]
- Table 2 Development of a typical contractor’s project management plan
- Table 3 Content of a typical project management plan
- 6 Scope definition and scope-related processes [Go to Page]
- 6.1 General [Go to Page]
- a) establish a requirement for the project, and the benefits the client expects to obtain by undertaking it;
- b) establish the client’s brief, or set of requirements and constraints, for the project;
- c) develop this brief into a scope and detailed specification;
- d) break the overall scope down into packages for planning purposes; and
- e) provide processes to allow change to be made to the scope in a controlled manner.
- 6.2 Inception - Client requirements and constraints [Go to Page]
- a) the benefits sought from the project, e.g. return on investment, payback period, etc.;
- b) the functional requirements expected of the product; and
- c) the timetable for delivery of the product.
- Figure 13 Scope definition [Go to Page]
- 1) the available budget, and any constraints associated with cash flow;
- 2) the available resources; and
- 3) constraints imposed by the client organization, such as operating processes or when the site will be available.
- 6.3 Stakeholder requirements and constraints [Go to Page]
- a) all interested stakeholders (external and internal, positive or negative);
- b) their concerns;
- c) any legitimate requirements they might have relating to the project or product, and any constraints they might impose on the project or product; and
- d) the influence they are likely to be able to exert.
- 6.4 Feasibility evaluation and the project brief [Go to Page]
- a) the client’s requirements;
- b) the client’s constraints;
- c) legitimate stakeholder requirements; and
- d) constraints imposed by stakeholders. [Go to Page]
- 1) the client;
- 2) stakeholders; and
- 3) regulatory processes.
- 6.5 Scope development and control
- 6.6 Work breakdown structure [Go to Page]
- Figure 14 Example of a product breakdown structure
- Figure 15 Example of a work breakdown structure
- 6.7 Control of activities
- 6.8 Change management [Go to Page]
- a) managing changes to the project brief, project scope, and project management plan;
- b) coordinating changes across interlinked project processes and resolving any conflicts;
- c) procedures for documenting change;
- d) continual improvement;
- e) aspects of change affecting personnel;
- f) operational factors; and
- g) lifecycle maintenance.
- 6.9 Configuration management
- 7 Project organization structure [Go to Page]
- 7.1 General
- 7.2 Internal client project organization [Go to Page]
- a) scope;
- b) scope change;
- c) budget approval;
- d) schedule approval;
- e) entering into contracts; and
- f) payment approval.
- 1) setting and agreeing the project brief;
- 2) signing off scope, budget and schedule at control points;
- 3) approving and entering into contract with suppliers; and
- 4) making payments.
- Figure 16 Interface between the client’s internal organization and the project organization
- Figure 17 Example of a hierarchical functional organization
- Figure 18 Example of a project-oriented organization
- Figure 19 Example of a matrix organization
- 7.3 Project organization [Go to Page]
- a) put in place a team to carry out each and all of the functions necessary to deliver the project in an efficient manner;
- b) make best use of the capabilities of available resources;
- c) be appropriate to the project scope, the size of the project team, local conditions and the processes employed;
- d) facilitate the desired allocation of risk;
- e) relate to the level of management input the client proposes to make into the project;
- f) ensure the necessary expertise is available to attend to each of the project processes, particularly the regulatory processes; and
- g) facilitate effective and efficient communication and cooperation between all participants in the project.
- 7.4 Management authority
- 7.5 Communication
- 7.6 Contractual relationships
- 7.7 Resource management
- 8 The project lifecycle [Go to Page]
- 8.1 General [Go to Page]
- Figure 20 Changes in risk and commitment over the project lifecycle
- 8.2 Project phases [Go to Page]
- a) conception;
- b) feasibility;
- c) realization;
- d) operation (post-handover);
- e) termination (post-handover).
- 8.3 Control points
- 9 The product delivery process [Go to Page]
- 9.1 General [Go to Page]
- Figure 21 The product delivery process
- Figure 22 Integration of construction project management processes
- 9.2 Initiation
- 9.3 Feasibility
- 9.4 Outline design
- 9.5 Scheme design
- 9.6 Detailed design
- 9.7 Mobilization
- 9.8 Construction
- 9.9 Commissioning
- 9.10 Handover and completion
- 10 Regulatory and enabling processes [Go to Page]
- 10.1 General
- 10.2 Design principles and materials standards [Go to Page]
- 10.2.1 Published standards
- 10.2.2 Deleterious materials
- 10.2.3 Sustainable materials
- 10.3 Client and project-specific third-party approval
- 10.4 Standard operating policies [Go to Page]
- 10.4.1 Client operating policies
- 10.4.2 Project team member operating policies
- 10.5 Funding
- 10.6 Management of regulatory and enabling processes [Go to Page]
- 10.6.1 General [Go to Page]
- a) it should be properly identified;
- b) its effect on the project should be assessed;
- c) a plan should be formulated to deal with the matter;
- d) the plan should be implemented;
- e) implementation of the plan should be monitored to confirm that the planned objective is being achieved; and
- f) where there is a departure from plan, control action should be taken to address the departure from plan.
- 10.6.2 Identification of issues
- 10.6.3 Planning
- 10.6.4 Monitoring
- 10.6.5 Control
- 10.6.6 Review
- 11 Project management control processes [Go to Page]
- 11.1 General [Go to Page]
- a) management responsibility;
- b) resource management;
- c) scope-related processes (see Clause 6);
- d) time-related processes;
- e) cost-related processes including value management;
- f) communication-related processes;
- g) risk-related processes;
- h) procurement-related processes;
- i) project and process closure; and
- j) measurement, analysis and improvement.
- Figure 23 The project management control process
- 11.2 Management responsibility [Go to Page]
- 11.2.1 Management commitment [Go to Page]
- a) provide input into the design of project processes;
- b) create a culture for safety, sustainability and quality;
- c) actively create a culture that motivates the project team toward achieving the project objectives; and
- d) provide a commitment to team development.
- 11.2.2 Project process [Go to Page]
- 11.2.2.1 Process approach
- 11.2.2.2 System approach to management
- 11.2.2.3 Application of quality management principles through the project process
- 11.2.2.4 Customer focus
- 11.2.2.5 Continual improvement
- 11.2.2.6 Mutually beneficial supplier relationship
- 11.2.3 Management reviews and progress evaluation [Go to Page]
- 11.2.3.1 Management reviews
- 11.2.3.2 Progress evaluation [Go to Page]
- a) Progress evaluations should be used: [Go to Page]
- 1) to assess the adequacy of the project management plan and how the work performed conforms to it;
- 2) to assess whether the project processes are running to plan, to identify any variances and the reasons for these variances, and to facilitate the planning of any necessary corrective action;
- 3) to evaluate how well the project processes are synchronized and interlinked;
- 4) to identify and evaluate activities and results that could adversely or favourably affect the achievement of the project objectives;
- 5) to obtain inputs for planning the remaining work in the project;
- 6) to facilitate communication; and
- 7) to drive process improvement in the project, by identifying deviations and changes in risks.
- b) Progress evaluations should be planned. The planning should include: [Go to Page]
- 1) the preparation of a schedule of regular progress evaluations (for inclusion in the project management plan);
- 2) the assignment of responsibility for the management of individual progress evaluations;
- 3) the specification of the purpose, assessment requirements, processes and outputs for each progress evaluation;
- 4) the assignment of personnel to participate in the evaluation (e.g. the individuals responsible for the project processes and other interested parties);
- 5) ensuring that appropriate personnel from the project processes being evaluated are available to provide information for the review or to answer questions; and
- 6) ensuring that relevant information is prepared and is available for the evaluation (e.g. the project management plan).
- c) Those performing the evaluations should: [Go to Page]
- 1) understand the purpose of the processes being evaluated, and their effect on the project quality management system;
- 2) examine relevant process inputs and outputs;
- 3) review the monitoring and measuring criteria being applied to the processes;
- 4) determine whether the processes are effective; and
- 5) look for potential improvements in process efficiencies.
- d) Once a progress evaluation has been performed: [Go to Page]
- 1) the outputs of the evaluation should be assessed against the project’s objectives, to determine whether the performance of the project against the planned objectives is acceptable; and
- 2) responsibility should be assigned for actions resulting from the progress evaluation.
- 11.3 Resource management [Go to Page]
- 11.3.1 Resource-related processes [Go to Page]
- 11.3.1.1 General
- 11.3.1.2 Resource planning
- 11.3.1.3 Resource control
- 11.3.2 Personnel-related processes [Go to Page]
- 11.3.2.1 General
- 11.3.2.2 Leadership
- 11.3.2.3 Involvement of people
- 11.3.2.4 Allocation of personnel
- 11.4 Time-related processes [Go to Page]
- 11.4.1 General
- 11.4.2 Planning of activity dependencies
- 11.4.3 Estimation of durations
- 11.4.4 Schedule development
- 11.4.5 Schedule control
- 11.5 Cost-related processes [Go to Page]
- 11.5.1 General
- 11.5.2 Cost estimating
- 11.5.3 Budgeting
- 11.5.4 Cost management
- 11.5.5 Earned value analysis
- 11.6 Communication-related processes [Go to Page]
- 11.6.1 General
- 11.6.2 Communication planning
- 11.6.3 Information management [Go to Page]
- 11.6.3.1 General
- 11.6.3.2 General communication and correspondence
- 11.6.3.3 Drawings and specifications
- 11.6.3.4 Contracts and agreements
- 11.6.3.5 Meetings
- 11.6.4 Communication control
- 11.7 Risk-related processes [Go to Page]
- 11.7.1 General
- 11.7.2 Risk identification [Go to Page]
- a) risk associated with the regulatory processes;
- b) risks resulting from any proposed use of new technologies;
- c) risks due to a failure of the project processes; and
- d) risk associated with internal and external politics.
- 11.7.3 Risk assessment
- 11.7.4 Risk treatment
- 11.7.5 Risk control
- 11.8 Procurement-related processes [Go to Page]
- 11.8.1 General
- 11.8.2 Procurement planning
- 11.8.3 Supplier identification, evaluation and shortlisting
- 11.8.4 Documentation of purchasing requirements [Go to Page]
- a) purchasing responsibility;
- b) procurement route (tender, negotiation, etc.);
- c) statutory procurement regulations (e.g. EU Procurement Directives [6]);
- d) associated legal or regulatory matters;
- e) bid evaluation procedure;
- f) procurement timetable;
- g) budget cost; and
- h) required delivery dates for the product.
- 1) a description of the product’s characteristics (schedule of services in the case of a design consultant, drawings and specifications in the case of a contractor);
- 2) the timetable for delivery of the product;
- 3) requirements to interface with other suppliers;
- 4) appropriate quality management system requirements;
- 5) insurance requirements;
- 6) requirements for auditing (when necessary);
- 7) right of access to supplier premises;
- 8) the contract the supplier will be expected to enter into, including requirements for reporting, level of damages, etc.;
- 9) any warranties the supplier will be expected to provide;
- 10) any requirements for bonds or guarantees;
- 11) the tendering documents themselves;
- 12) liquidated damages, where applicable;
- 13) dispute resolution procedures.
- 11.9 Project and process closure
- 11.10 Measurement, analysis and improvement [Go to Page]
- 11.10.1 Improvement-related processes
- 11.10.2 Measurement and analysis
- 11.10.3 Continual improvement
- Annex A (informative) Examples of project organization structures [Go to Page]
- A.1 Traditional management structure [Go to Page]
- Figure A.1 Traditional management structures - Lines of authority
- Figure A.2 Traditional management structure - Contractual relationships
- A.2 Design and build management structure [Go to Page]
- Figure A.3 Design and build - Lines of authority
- Figure A.4 Design and build - Contractual relationships
- A.3 Management structure for construction management [Go to Page]
- Figure A.5 Construction management - Lines of authority
- Figure A.6 Construction management structure - Contractual relationships
- A.4 Turnkey management structure [Go to Page]
- Figure A.7 Turnkey management structure - Lines of authority
- Figure A.8 Turnkey management structure - Contractual relationships
- A.5 Management structure for executive project management [Go to Page]
- Figure A.9 Executive project management - Lines of authority
- Figure A.10 Executive project management - Contractual relationships
- Annex B (informative) Project lifecycles [Go to Page]
- Table B.1 Examples of project phase descriptions used in the construction industry
- Annex C (informative) Published standards [Go to Page]
- C.1 British Standards
- C.2 ISO Standards
- C.3 Material and component standards
- Bibliography [Go to Page]
- [1] GREAT BRITAIN. Construction (Design and Management) Regulations 1994 and subsequent amendments. London: HMSO.
- [2] GREAT BRITAIN. Building Regulations 2000 and subsequent amendments. London: The Stationery Office.
- [3] GREAT BRITAIN. Building Standards (Scotland) Regulations 1990 and subsequent amendments. London: HMSO.
- [4] GREAT BRITAIN. Building Regulations (Northern Ireland) 2000. London: The Stationery Office.
- [5] GREAT BRITAIN. Freedom of Information Act 2000. London: The Stationery Office.
- [6] EUROPEAN COMMUNITIES. 98/4/EC. EC Procurement Directives Directive 98/4/EC of the European Parliament and of the Council of ... [Go to Page]