Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
IEEE Guide for the Installation of Vertical Generators and Generator/Motors for Hydroelectric Applications (Published), 2012
- IEEE Std 1095-2012 Front Cover
- Title page
- Notice to users
[Go to Page]
- Laws and regulations
- Copyrights
- Updating of IEEE documents
- Errata
- Patents
- Participants
- Introduction
- Contents
- Important notice
- 1. Overview [Go to Page]
- 1.1 Scope
- 1.2 Purpose
- 2. Normative references
- 3. Tools and facilities [Go to Page]
- 3.1 General
- 3.2 Erection contractor-supplied tools
- 3.3 Manufacturer-supplied tools
- 3.4 Customer-supplied materials, services, and facilities
- 4. Personnel
- 5. Generator construction [Go to Page]
- 5.1 General arrangement
- 5.2 Stator construction
- 5.3 Rotor construction
- 5.4 Shaft and coupling
- 5.5 Thrust bearing
- 5.6 Guide bearings
- 5.7 Brakes and jacks
- 5.8 Field assembly requirements
- 6. Preparation of generator and turbine shafts in factory [Go to Page]
- 6.1 Factory preassembly and alignment
- 6.2 Field alignment
- 7. Installation precautions [Go to Page]
- 7.1 Position references
- 7.2 Handling of generator parts
- 7.3 Matching of parts
- 7.4 Use of plumb lines
- 7.5 Precautions in welding
- 7.6 Cleanliness
- 7.7 Record keeping
- 8. Receiving, storing, and unpacking [Go to Page]
- 8.1 Receiving
- 8.2 Storing
- 8.3 Unpacking
- 9. Erection procedures [Go to Page]
- 9.1 General
- 9.2 Generator shipped completely assembled
- 9.3 Generator assembled in the field, thrust bearing above the rotor, spring type or self-equalizing type thrust bearing
- 9.4 Generator assembled in the field, thrust bearing above the rotor, adjustable-shoe type thrust bearing
- 9.5 Generator assembled in the field, thrust bearing below the rotor, spring type or self-equalizing thrust bearing
- 9.6 Generator assembled in the field, thrust bearing below the rotor, adjustable-shoe type thrust bearing
- 10. Details of erection procedures [Go to Page]
- 10.1 Placing of foundation bolts
- 10.2 Positioning and grouting of soleplates
- 10.3 Assembly of stator
- 10.4 Assembly of rotor
- 10.5 Assembly of thrust bearing
- 10.6 Assembly of guide bearings
- 10.7 Installation of lubrication system
- 10.8 Checking air gap
- 10.9 Check of insulation against shaft currents
- 10.10 Closing of generator-turbine coupling
- 10.11 Shaft-plumb and straightness check
- 10.12 Equalizing the load on adjustable-shoe type bearings
- 10.13 Check of shaft runout
- 10.14 Assembly of collector rings and brush rigging
- 10.15 Assembly of rotating dc or brushless exciters
- 10.16 Installation of instruments and relays
- 11. Mechanical run [Go to Page]
- 11.1 General
- 11.2 Preparation for initial start
- 11.3 Initial start
- 11.4 Check of shaft runout
- 12. Balancing
- 13. Insulation testing and drying out [Go to Page]
- 13.1 Measurement of winding insulation resistance
- 13.2 Drying out of windings
- 13.3 High-potential tests
- 14. Initial operation [Go to Page]
- 14.1 No-load operation with excitation
- 14.2 Connection to power system
- 14.3 Load rejection tests
- 14.4 Operation check of vibration and shaft runout
- 15. Field tests [Go to Page]
- 15.1 Vertical hydraulic-turbine generator shaft runout tolerances, installation check
- 15.2 Electrical tests
- Annex A (informative) Bibliography [Go to Page]