IEEE Guide for the Commissioning of Electrical Systems in Hydroelectric Power Plants, 2020
- IEEE Std 1248-2020 Front Cover
- Title page
- Important Notices and Disclaimers Concerning IEEE Standards Document
- Participants
- Introduction
- Contents
- 1. Overview [Go to Page]
- 1.1 Scope
- 1.2 Purpose
- 1.3 Organization
- 2. Normative references
- 3. Definitions, acronyms, and abbreviations [Go to Page]
- 3.1 Definitions
- 3.2 Acronyms and abbreviations
- 4. Commissioning planning, roles, and responsibilities [Go to Page]
- 4.1 Planning
- 4.2 Owner
- 4.3 Contractor
- 4.4 Engineer [Go to Page]
- 4.4.1 Project design engineering
- 4.4.2 Lead test engineer
- 4.5 Manufacturer/vendor
- 5. Commissioning program phases [Go to Page]
- 5.1 Construction test phase [Go to Page]
- 5.1.1 Electrical
- 5.1.2 Mechanical
- 5.1.3 Instrumentation
- 5.2 Preoperational test phase
- 5.3 Operational test phase [Go to Page]
- 5.3.1 Electrical system operational testing
- 5.3.2 Unit operational testing
- 5.4 Performance testing
- 6. Commissioning implementation [Go to Page]
- 6.1 General
- 6.2 Construction completion phase [Go to Page]
- 6.2.1 Electrical
- 6.2.2 Mechanical
- 6.2.3 Instrumentation
- 6.3 Preoperational testing phase [Go to Page]
- 6.3.1 Electrical
- 6.3.2 Mechanical
- 6.3.3 Instrumentation
- 6.4 Operational testing phase and unit startup
- 6.5 Performance testing
- 7. Application of this guide [Go to Page]
- 7.1 General
- 7.2 Using this guide to develop a test program
- 7.3 Coordinating commissioning tests of systems and units
- 8. Plant equipment [Go to Page]
- 8.1 List of equipment and test matrixes [Go to Page]
- 8.1.1 AC POWER Medium- and low-voltage switchgear
- 8.1.2 AC POWER Motor control centers (MCCs) (600 V class)
- 8.1.3 AC POWER Distribution panels (600 V class)
- 8.1.4 CABLING
- 8.1.5 CATHODIC PROTECTION
- 8.1.6 COMPRESSED AIR
- 8.1.7 CONTROL SYSTEM
- 8.1.8 CRANES
- 8.1.9 DC POWER Batteries
- 8.1.10 DC POWER Chargers
- 8.1.11 DC POWER Distribution panel
- 8.1.12 DRAINAGE/ UNWATERING
- 8.1.13 ELEVATORS
- 8.1.14 EMERGENCY POWER UPS
- 8.1.15 EMERGENCY POWER UPS distribution panel
- 8.1.16 EMERGENCY POWER Diesel generators
- 8.1.17 ENVIRONMENTAL
- 8.1.18 EXCITATION SYSTEMS
- 8.1.19 FIRE DETECTION
- 8.1.20 FIRE PROTECTION GAS (CO2, Halon, other)
- 8.1.21 FIRE PROTECTION Water
- 8.1.22 FLOW MONITORING
- 8.1.23 GENERATOR
- 8.1.24 GENERATOR SWITCHGEAR/TERMINAL EQUIPMENT
- 8.1.25 GOVERNOR
- 8.1.26 GREASING
- 8.1.27 GROUNDING
- 8.1.28 HIGH-VOLTAGE SWITCHGEAR
- 8.1.29 HEATING, VENTILATION, AND AIR CONDITIONING
- 8.1.30 HYDRAULIC SYSTEMS
- 8.1.31 HYDRAULIC TURBINE
- 8.1.32 INSTRUMENTATION AND CONTROL
- 8.1.33 LOAD COMMUTATING INVERTER/CYCLOCONVERTER
- 8.1.34 LEVEL DETECTORS
- 8.1.35 LIGHTING
- 8.1.36 LUBE OIL
- 8.1.37 PENSTOCK RUPTURE MONITORING
- 8.1.38 POTABLE WATER
- 8.1.39 POWERHOUSE COMMUNICATION
- 8.1.40 PROTECTIVE RELAYING
- 8.1.41 SANITARY WASTE
- 8.1.42 SECURITY, PHYSICAL
- 8.1.43 SEISMIC MONITORING
- 8.1.44 SERVICE WATER
- 8.1.45 SPILLWAY CONTROL
- 8.1.46 TRANSFORMERS
- 8.1.47 OIL STORAGE
- 9. Descriptions of tests [Go to Page]
- 9.1 General
- 9.2 Construction tests [Go to Page]
- 9.2.1 Accuracy test—Protective relays [Go to Page]
- 9.2.1.1 Description of test
- 9.2.1.2 Supporting documents
- 9.2.1.3 Equipment required
- 9.2.1.4 Duration/work required
- 9.2.2 Air gap measurement—Generator [Go to Page]
- 9.2.2.1 Description of test
- 9.2.2.2 Supporting documents
- 9.2.2.3 Equipment required
- 9.2.2.4 Duration/work required
- 9.2.3 Bearing insulation—Turbine-generator bearings [Go to Page]
- 9.2.3.1 Description of test
- 9.2.3.2 Supporting documents
- 9.2.3.3 Equipment required
- 9.2.3.4 Duration/work required
- 9.2.4 Bolted joint torque—Fasteners [Go to Page]
- 9.2.4.1 Description of test
- 9.2.4.2 Supporting documents
- 9.2.4.3 Equipment required
- 9.2.4.4 Duration/work required
- 9.2.5 Calibration—Instrumentation [Go to Page]
- 9.2.5.1 Description of test
- 9.2.5.2 Supporting documents
- 9.2.5.3 Equipment required
- 9.2.5.4 Duration/work required
- 9.2.6 Circuitry checkout—Control circuits [Go to Page]
- 9.2.6.1 Description of test
- 9.2.6.2 Supporting documents
- 9.2.6.3 Equipment required
- 9.2.6.4 Duration/work required
- 9.2.7 Clearance measurement—Turbine-generator [Go to Page]
- 9.2.7.1 Description of test
- 9.2.7.2 Supporting documents
- 9.2.7.3 Equipment required
- 9.2.7.4 Duration/work required
- 9.2.8 Contact resistance—Circuit breakers [Go to Page]
- 9.2.8.1 Description of test
- 9.2.8.2 Supporting documents
- 9.2.8.3 Equipment required
- 9.2.8.4 Duration/work required
- 9.2.9 Continuity checks—Control wiring [Go to Page]
- 9.2.9.1 Description of test
- 9.2.9.2 Supporting documents
- 9.2.9.3 Equipment required
- 9.2.9.4 Duration/work required
- 9.2.10 Core ground test—Power transformer [Go to Page]
- 9.2.10.1 Description of test
- 9.2.10.2 Supporting documents
- 9.2.10.3 Equipment required
- 9.2.10.4 Duration/work required
- 9.2.11 CT saturation—Current transformer [Go to Page]
- 9.2.11.1 Description of test
- 9.2.11.2 Supporting documents
- 9.2.11.3 Equipment required
- 9.2.11.4 Duration/work required
- 9.2.12 Current measure—Cathodic protection [Go to Page]
- 9.2.12.1 Description of test
- 9.2.12.2 Supporting documents
- 9.2.12.3 Equipment required
- 9.2.12.4 Duration/work required
- 9.2.13 DC winding resistance—Stator and rotor windings, power transformers [Go to Page]
- 9.2.13.1 Description of test
- 9.2.13.2 Supporting documents
- 9.2.13.3 Equipment required
- 9.2.13.4 Duration/work required
- 9.2.14 Earth resistivity—Ground system [Go to Page]
- 9.2.14.1 Description of test
- 9.2.14.2 Supporting documents
- 9.2.14.3 Equipment required
- 9.2.14.4 Duration/work required
- 9.2.15 Flushing—Piping systems [Go to Page]
- 9.2.15.1 Description of test
- 9.2.15.2 Supporting documents
- 9.2.15.3 Equipment required
- 9.2.15.4 Duration/work required
- 9.2.16 Functional checks—Equipment [Go to Page]
- 9.2.16.1 Description of test
- 9.2.16.2 Supporting documents
- 9.2.16.3 Equipment required
- 9.2.16.4 Duration/work required
- 9.2.17 Gas pressure, SF6 [Go to Page]
- 9.2.17.1 Description of test
- 9.2.17.2 Supporting documents
- 9.2.17.3 Equipment required
- 9.2.17.4 Duration/work required
- 9.2.18 Ground testing—Electrical circuits [Go to Page]
- 9.2.18.1 Description of test
- 9.2.18.2 Supporting documents
- 9.2.18.3 Equipment required
- 9.2.18.4 Duration/work required
- 9.2.18.5 Notes
- 9.2.19 Ground isolation—DC system [Go to Page]
- 9.2.19.1 Description of test
- 9.2.19.2 Supporting documents
- 9.2.19.3 Equipment required
- 9.2.19.4 Duration/work required
- 9.2.20 High potential—Electrical equipment and cables [Go to Page]
- 9.2.20.1 Description of test
- 9.2.20.2 Supporting documents
- 9.2.20.3 Equipment required
- 9.2.20.4 Duration/work required
- 9.2.20.5 Notes
- 9.2.21 Instrument transformer burden—CTs and PTs [Go to Page]
- 9.2.21.1 Description of test
- 9.2.21.2 Supporting documents
- 9.2.21.3 Equipment required
- 9.2.21.4 Duration/work required
- 9.2.22 Insulation power factor—Circuit breaker [Go to Page]
- 9.2.22.1 Description of test
- 9.2.22.2 Supporting documents
- 9.2.22.3 Equipment required
- 9.2.22.4 Duration/work required
- 9.2.23 Insulation resistance—Cables and electrical equipment [Go to Page]
- 9.2.23.1 Description of test
- 9.2.23.2 Supporting documents
- 9.2.23.3 Equipment required
- 9.2.23.4 Duration/work required
- 9.2.23.5 Leak testing—Air, oil, and water systems
- 9.2.23.6 Description
- 9.2.23.7 Supporting documents
- 9.2.23.8 Equipment required
- 9.2.23.9 Duration/work required
- 9.2.24 Loop, core magnetization, test—Generator [Go to Page]
- 9.2.24.1 Description of test
- 9.2.24.2 Supporting documents
- 9.2.24.3 Equipment required
- 9.2.24.4 Duration/work required
- 9.2.25 No-load losses—Power transformers [Go to Page]
- 9.2.25.1 Description of test
- 9.2.25.2 Supporting documents
- 9.2.25.3 Equipment required
- 9.2.25.4 Duration/work required
- 9.2.25.5 Oil dielectric strength—Electrical insulating oils
- 9.2.25.6 Description of test
- 9.2.25.7 Supporting documents
- 9.2.25.8 Equipment required
- 9.2.25.9 Duration/work required
- 9.2.26 Oil quality—Electrical insulating oils [Go to Page]
- 9.2.26.1 Description of test
- 9.2.26.2 Supporting documents
- 9.2.26.3 Equipment required
- 9.2.26.4 Duration/work required
- 9.2.27 Operating coil continuity—Circuit breaker [Go to Page]
- 9.2.27.1 Description of test
- 9.2.27.2 Supporting documents
- 9.2.27.3 Equipment required
- 9.2.27.4 Duration/work required
- 9.2.28 Phase relation—Three-phase power system [Go to Page]
- 9.2.28.1 Description of test
- 9.2.28.2 Supporting documents
- 9.2.28.3 Equipment required
- 9.2.28.4 Duration/work required
- 9.2.28.5 Polarity (ac)—CTs and PTs
- 9.2.28.6 Description of test
- 9.2.28.7 Supporting documents
- 9.2.28.8 Equipment required
- 9.2.28.9 Duration/work required
- 9.2.29 Polarity (dc)—DC equipment and cables [Go to Page]
- 9.2.29.1 Description of test
- 9.2.29.2 Supporting documents
- 9.2.29.3 Equipment required
- 9.2.29.4 Duration/work required
- 9.2.30 Pressure testing—Piping and pressure vessels [Go to Page]
- 9.2.30.1 Description of test
- 9.2.30.2 Supporting documents
- 9.2.30.3 Equipment required
- 9.2.30.4 Duration/work required
- 9.2.31 Ratios—CTs and PTs [Go to Page]
- 9.2.31.1 Description of test
- 9.2.31.2 Supporting documents
- 9.2.31.3 Equipment required
- 9.2.31.4 Duration/work required
- 9.2.31.5 Shaft runout—Turbine-generator shaft
- 9.2.31.6 Description of test
- 9.2.31.7 Supporting documents
- 9.2.31.8 Equipment required
- 9.2.31.9 Duration/work required
- 9.2.32 Specific gravity—Battery [Go to Page]
- 9.2.32.1 Description of test
- 9.2.32.2 Supporting documents
- 9.2.32.3 Equipment required
- 9.2.32.4 Duration/work required
- 9.2.33 Threshold settings—Control and protection devices [Go to Page]
- 9.2.33.1 Description of test
- 9.2.33.2 Supporting documents
- 9.2.33.3 Equipment required
- 9.2.33.4 Duration/work required
- 9.2.33.5 Notes
- 9.2.34 Timing—Circuit breaker [Go to Page]
- 9.2.34.1 Description of test
- 9.2.34.2 Supporting documents
- 9.2.34.3 Equipment required
- 9.2.34.4 Duration/work required
- 9.2.35 Turn insulation—Generator stator and rotor coils [Go to Page]
- 9.2.35.1 Description of test
- 9.2.35.2 Supporting documents
- 9.2.35.3 Equipment required
- 9.2.35.4 Duration/work required
- 9.2.36 Visual inspection—All equipment [Go to Page]
- 9.2.36.1 Description of test
- 9.2.36.2 Supporting documents
- 9.2.36.3 Equipment required
- 9.2.36.4 Duration/work required
- 9.3 Preoperational tests [Go to Page]
- 9.3.1 Air balance—Air handling and HVAC systems [Go to Page]
- 9.3.1.1 Description of test
- 9.3.1.2 Supporting documents
- 9.3.1.3 Equipment required
- 9.3.1.4 Duration/work required
- 9.3.2 Discharge/capacity—Battery [Go to Page]
- 9.3.2.1 Description of test
- 9.3.3 Braking system [Go to Page]
- 9.3.3.1 Description of test
- 9.3.3.2 Supporting documents
- 9.3.3.3 Equipment required
- 9.3.3.4 Duration/work required
- 9.3.4 Bus transfer—Station service power [Go to Page]
- 9.3.4.1 Description of test
- 9.3.4.2 Supporting documents
- 9.3.4.3 Equipment required
- 9.3.4.4 Duration/work required
- 9.3.5 Circuit-breaker trip—Circuit breaker trip circuits [Go to Page]
- 9.3.5.1 Description of test
- 9.3.5.2 Supporting documents
- 9.3.5.3 Equipment required
- 9.3.5.4 Duration/work required
- 9.3.6 Control system—Digital [Go to Page]
- 9.3.6.1 Description of test
- 9.3.6.2 Supporting documents
- 9.3.6.3 Equipment required
- 9.3.6.4 Duration/work required
- 9.3.7 Differential pressure test—Turbine servomotors [Go to Page]
- 9.3.7.1 Description of test
- 9.3.7.2 Supporting documents
- 9.3.7.3 Equipment required
- 9.3.7.4 Duration/work required
- 9.3.8 Energize auxiliary power—Auxiliary power systems [Go to Page]
- 9.3.8.1 Description of test
- 9.3.8.2 Supporting documents
- 9.3.8.3 Equipment required
- 9.3.8.4 Duration/work required
- 9.3.9 Equalizing charge—Battery [Go to Page]
- 9.3.9.1 Description of test
- 9.3.9.2 Supporting documents
- 9.3.9.3 Equipment required
- 9.3.9.4 Duration/work required
- 9.3.10 Gas-in-oil analysis—Power transformer [Go to Page]
- 9.3.10.1 Description of test
- 9.3.10.2 Supporting documents
- 9.3.10.3 Equipment required
- 9.3.10.4 Duration/work required
- 9.3.11 Fire code test (CO2 and other gas based systems) [Go to Page]
- 9.3.11.1 Description of test
- 9.3.11.2 Supporting documents
- 9.3.11.3 Equipment required
- 9.3.11.4 Duration/work required
- 9.3.12 Fire code test (water-based systems) [Go to Page]
- 9.3.12.1 Description of test
- 9.3.12.2 Equipment required
- 9.3.12.3 Duration/work required
- 9.3.13 Fire zone system—Fire detection system [Go to Page]
- 9.3.13.1 Description of test
- 9.3.13.2 Supporting documents
- 9.3.13.3 Equipment required
- 9.3.13.4 Duration/work required
- 9.3.14 Float charge system—Battery [Go to Page]
- 9.3.14.1 Description of test
- 9.3.14.2 Supporting documents
- 9.3.14.3 Equipment required
- 9.3.14.4 Duration/work required
- 9.3.15 Frequency stability—Uninterruptible ac power [Go to Page]
- 9.3.15.1 Description of test
- 9.3.15.2 Supporting documents
- 9.3.15.3 Equipment required
- 9.3.15.4 Duration/work required
- 9.3.16 Harmonic distortion—Power electronics, static excitation [Go to Page]
- 9.3.16.1 Description of test
- 9.3.16.2 Supporting documents
- 9.3.16.3 Equipment required
- 9.3.16.4 Duration/work required
- 9.3.17 Initial operation operational—Systems [Go to Page]
- 9.3.17.1 Description of test
- 9.3.17.2 Supporting documents
- 9.3.17.3 Equipment required
- 9.3.17.4 Duration/work required
- 9.3.18 Initial rotation—Turbine-generator unit [Go to Page]
- 9.3.18.1 Description of test
- 9.3.18.2 Supporting documents
- 9.3.18.3 Equipment required
- 9.3.18.4 Duration/work required
- 9.3.19 Lubricating/hydraulic oil check—Turbine-generator systems [Go to Page]
- 9.3.19.1 Description of test
- 9.3.19.2 Supporting documents
- 9.3.19.3 Equipment required
- 9.3.19.4 Duration/work required
- 9.3.20 Phase rotation—Polyphase motors and generators [Go to Page]
- 9.3.20.1 Description of test
- 9.3.20.2 Supporting documents
- 9.3.20.3 Equipment required
- 9.3.20.4 Duration/work required
- 9.3.21 Servomotor timing—Turbine servomotors [Go to Page]
- 9.3.21.1 Description of test
- 9.3.21.2 Supporting documents
- 9.3.21.3 Equipment required
- 9.3.21.4 Duration/work required
- 9.3.22 Station ground resistance [Go to Page]
- 9.3.22.1 Description of test
- 9.3.22.2 Supporting documents
- 9.3.22.3 Equipment required
- 9.3.22.4 Duration/work required
- 9.3.23 Standard temperature—Battery [Go to Page]
- 9.3.23.1 Description of test
- 9.3.23.2 Supporting documents
- 9.3.23.3 Equipment required
- 9.3.23.4 Duration/work required
- 9.3.24 Voltage level—Battery [Go to Page]
- 9.3.24.1 Description of test
- 9.3.24.2 Supporting documents
- 9.3.24.3 Equipment required
- 9.3.24.4 Duration/work required
- 9.3.25 Volumetric—Gas fire systems [Go to Page]
- 9.3.25.1 Description of test
- 9.3.25.2 Supporting documents
- 9.3.25.3 Equipment required
- 9.3.25.4 Duration/work required
- 9.3.26 Voltage measure—Cathodic protection [Go to Page]
- 9.3.26.1 Description of test
- 9.3.26.2 Supporting documents
- 9.3.26.3 Equipment required
- 9.3.26.4 Duration/work required
- 9.4 Operational tests [Go to Page]
- 9.4.1 AC impedance—Transformer neutral reactor [Go to Page]
- 9.4.1.1 Description of test
- 9.4.1.2 Supporting documents
- 9.4.1.3 Equipment required
- 9.4.1.4 Duration/work required
- 9.4.2 Balancing—Rotating equipment [Go to Page]
- 9.4.2.1 Description of test
- 9.4.2.2 Supporting documents
- 9.4.2.3 Equipment required
- 9.4.2.4 Duration/work required
- 9.4.3 Bearing heat run—Unit bearings [Go to Page]
- 9.4.3.1 Description of test
- 9.4.3.2 Supporting documents
- 9.4.3.3 Equipment required
- 9.4.3.4 Duration/work required
- 9.4.4 Crane operation [Go to Page]
- 9.4.4.1 Description of test
- 9.4.4.2 Supporting documents
- 9.4.4.3 Equipment required
- 9.4.4.4 Duration/work required
- 9.4.4.5 Supporting documents
- 9.4.4.6 Equipment required
- 9.4.4.7 Duration/work required
- 9.4.5 Draft tube depression [Go to Page]
- 9.4.5.1 Description of test
- 9.4.5.2 Supporting documents
- 9.4.5.3 Equipment required
- 9.4.5.4 Duration/work required
- 9.4.6 Load balance—DC power system [Go to Page]
- 9.4.6.1 Description of test
- 9.4.6.2 Supporting documents
- 9.4.6.3 Equipment required
- 9.4.6.4 Duration/work required
- 9.4.7 Load rejection—Turbine [Go to Page]
- 9.4.7.1 Description of test
- 9.4.7.2 Supporting documents
- 9.4.7.3 Equipment required
- 9.4.7.4 Duration/work required
- 9.4.8 Noise measurement—Operating equipment [Go to Page]
- 9.4.8.1 Description of test
- 9.4.8.2 Supporting documents
- 9.4.8.3 Equipment required
- 9.4.8.4 Duration/work required
- 9.4.9 Open circuit saturation—Generator [Go to Page]
- 9.4.9.1 Description of test
- 9.4.9.2 Supporting documents
- 9.4.9.3 Equipment required
- 9.4.9.4 Duration/work required
- 9.4.10 Overspeed—Turbine-generator [Go to Page]
- 9.4.10.1 Description of test
- 9.4.10.2 Supporting documents
- 9.4.10.3 Equipment required
- 9.4.10.4 Duration/work required
- 9.4.11 Partial discharge [Go to Page]
- 9.4.11.1 Description of the test
- 9.4.11.2 Supporting documents
- 9.4.11.3 Equipment required
- 9.4.11.4 Duration/work required
- 9.4.12 Short-circuit saturation—Generator [Go to Page]
- 9.4.12.1 Description of test
- 9.4.12.2 Supporting documents
- 9.4.12.3 Equipment required
- 9.4.12.4 Duration/work required
- 9.4.13 Sudden short circuit—Generator [Go to Page]
- 9.4.13.1 Description of test
- 9.4.13.2 Supporting documents
- 9.4.13.3 Equipment required
- 9.4.13.4 Duration/work required
- 9.4.14 Telephone influence factor (TIF)—Generator [Go to Page]
- 9.4.14.1 Description of test
- 9.4.14.2 Supporting documents
- 9.4.14.3 Equipment required
- 9.4.14.4 Duration/work required
- 9.4.15 Transformer excitation [Go to Page]
- 9.4.15.1 Description of test
- 9.4.15.2 Supporting documents
- 9.4.15.3 Equipment required
- 9.4.15.4 Duration/work required
- 9.4.16 Vibration check—Turbine [Go to Page]
- 9.4.16.1 Description of test
- 9.4.16.2 Supporting documents
- 9.4.16.3 Equipment required
- 9.4.16.4 Duration/work required
- 9.4.17 Voltage waveform deviation—Generator [Go to Page]
- 9.4.17.1 Description of test
- 9.4.17.2 Supporting documents
- 9.4.17.3 Equipment required
- 9.4.17.4 Duration/work required
- 9.5 Performance tests [Go to Page]
- 9.5.1 Efficiency test—Generator [Go to Page]
- 9.5.1.1 Description of test
- 9.5.1.2 Supporting documents
- 9.5.1.3 Equipment required
- 9.5.1.4 Duration/work required
- 9.5.2 Efficiency test—Turbine [Go to Page]
- 9.5.2.1 Description of test
- 9.5.2.2 Supporting documents
- 9.5.2.3 Equipment required
- 9.5.2.4 Duration/work required
- 9.5.3 EMI/RFI rejection—Electronic equipment [Go to Page]
- 9.5.3.1 Description of test
- 9.5.3.2 Supporting documents
- 9.5.3.3 Equipment required
- 9.5.3.4 Duration/work required
- 9.5.4 Index—Turbine [Go to Page]
- 9.5.4.1 Description of test
- 9.5.4.2 Supporting documents
- 9.5.4.3 Equipment required
- 9.5.4.4 Duration/work required
- 9.5.5 Load test performance—Crane [Go to Page]
- 9.5.5.1 Description of test
- 9.5.5.2 Supporting documents
- 9.5.5.3 Equipment required
- 9.5.5.4 Duration/work required
- 9.5.6 Temperature rise—Generator [Go to Page]
- 9.5.6.1 Description of test
- 9.5.6.2 Supporting documents
- 9.5.6.3 Equipment required
- 9.5.6.4 Duration/work required
- 10. Documentation [Go to Page]
- 10.1 Record keeping
- 10.2 Engineering documentation
- 10.3 Factory documentation
- 10.4 On-site documentation
- Annex A (informative) Bibliography [Go to Page]
- A.1 Turbines, generators, and motors
- A.2 Transformers
- A.3 Governors
- A.4 Cable and raceway
- A.5 Protection and relaying
- A.6 Excitation
- A.7 Insulation
- A.8 Batteries, ups, and standby power systems
- A.9 Breakers, switchgear, panelboards, and motor control centers
- A.10 Control and SCADA
- A.11 Grounding
- A.12 Definitions, codes, references, and tables
- A.13 Maintenance
- A.14 Fire protection
- A.15 Miscellaneous
- Back Cover [Go to Page]