Already a subscriber? 

MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?

ASME NM.2-2022 Fiber-Reinforced Thermosetting-Resin Piping Systems, 2022
- CONTENTS
- FOREWORD
- ASME NPPS COMMITTEE ROSTER
- CORRESPONDENCE WITH THE NPPS COMMITTEE
- INTRODUCTION
- ASME NM.2-2022 SUMMARY OF CHANGES
- Chapter 1 Scope and Definitions [Go to Page]
- 1-1 SCOPE [Go to Page]
- 1-1.1 Content and Coverage
- 1-1.2 Exclusions
- 1-2 TERMS AND DEFINITIONS
- 1-3 ABBREVIATIONS
- Chapter 2 Design [Go to Page]
- 2-1 DESIGN CONDITIONS [Go to Page]
- 2-1.1 Qualifications of the Designer
- 2-1.2 Design Pressure
- 2-1.3 Design Temperature
- 2-1.4 Ambient Effects
- 2-1.5 Dynamic Effects
- 2-1.6 Weight Effects
- 2-1.7 Thermal Expansion and Contraction Effects
- 2-1.8 Effects of Support, Anchor, and Terminal Movements
- 2-1.9 Reduced Impact Resistance
- 2-1.10 Cyclic Effects
- 2-2 DESIGN CRITERIA [Go to Page]
- 2-2.1 General
- 2-2.2 Pressure–Temperature Design Criteria
- 2-2.3 Allowable Stresses and Other Design Limits
- 2-3 PRESSURE DESIGN OF PIPING COMPONENTS [Go to Page]
- 2-3.1 General
- 2-3.2 Straight Pipe
- 2-3.3 Curved and Mitered Segments of Pipe
- 2-3.4 Branch Connections
- 2-3.5 Closures
- 2-3.6 Flanges
- 2-3.7 Reducers
- 2-3.8 Joints
- 2-3.9 Other Components
- 2-4 PIPE STRESS ANALYSIS [Go to Page]
- 2-4.1 Design Considerations
- 2-4.2 Concepts and Definition of Pipe Stress Analysis
- 2-4.3 Properties for Pipe Stress Analysis
- 2-4.4 Analysis
- 2-4.5 Reactions
- 2-4.6 Movements
- 2-4.7 Means of Increasing Flexibility
- 2-5 PIPING SUPPORT [Go to Page]
- 2-5.1 General
- 2-5.2 Allowable Stress Values for Metallic Pipe Support Elements
- 2-5.3 Materials
- 2-5.4 Threads
- 2-5.5 Fixtures
- 2-5.6 Structural Attachments
- 2-5.7 Structural Connections
- 2-5.8 Support Spacing
- 2-5.9 Pipe-Support Contact Surface
- 2-6 SPECIAL CRITERIA [Go to Page]
- 2-6.1 Chemical Environment and Erosive Services
- 2-6.2 Compressed Gas Services
- 2-6.3 Buried Piping
- Chapter 3 Constituent Materials [Go to Page]
- 3-1 GENERAL
- 3-2 MATERIALS AND SPECIFICATIONS [Go to Page]
- 3-2.1 Listed Constituent Materials
- 3-2.2 Unlisted Constituent Materials
- 3-2.3 Unknown Constituent Materials
- 3-2.4 Constituent Material Changes
- 3-3 TEMPERATURE LIMITATIONS [Go to Page]
- 3-3.1 General
- 3-3.2 Temperature Limits of Listed and Unlisted Polymeric Materials
- 3-3.3 Determination of Temperature Limits
- Chapter 4 Standards for Piping Components [Go to Page]
- 4-1 DIMENSIONS AND RATINGS OF COMPONENTS [Go to Page]
- 4-1.1 Listed Piping Components
- 4-1.2 Unlisted Piping Components
- 4-1.3 Threads
- 4-2 REFERENCES
- 4-3 QUALITY ASSURANCE AND CONFORMANCE [Go to Page]
- 4-3.1 Manufacturing Quality Assurance
- 4-3.2 Final Component Inspection
- 4-3.3 Labeling
- 4-3.4 Conformance
- Chapter 5 Fabrication, Assembly, and Erection [Go to Page]
- 5-1 GENERAL
- 5-2 BONDING [Go to Page]
- 5-2.1 Bonding Responsibility
- 5-2.2 Bonding Qualifications
- 5-2.3 Bonding Materials and Equipment
- 5-2.4 Preparation for Bonding
- 5-2.5 Bonding Requirements
- 5-2.6 Bonding Repair
- 5-2.7 Seal Bonds
- 5-3 ASSEMBLY AND ERECTION [Go to Page]
- 5-3.1 Tolerances and Alignment
- 5-3.2 Flanged and Mechanical Joints
- 5-3.3 Threaded Joints
- 5-3.4 Special Joints
- 5-3.5 Handling of Piping
- 5-3.6 Cleaning of Piping
- 5-3.7 Identification of Piping
- Chapter 6 Inspection, Examination, and Testing [Go to Page]
- 6-1 INSPECTION [Go to Page]
- 6-1.1 Responsibility for Inspection
- 6-1.2 Rights of the Owner’s Inspector
- 6-1.3 Qualifications of the Owner’s Inspector
- 6-2 EXAMINATION [Go to Page]
- 6-2.1 Responsibility for Examination
- 6-2.2 Examination Requirements
- 6-2.3 Extent of Examination
- 6-2.4 Supplementary Examination
- 6-2.5 Examination Personnel
- 6-2.6 Examination Procedures
- 6-2.7 Types of Examination
- 6-3 TESTING [Go to Page]
- 6-3.1 Required Leak Test
- 6-3.2 General Requirements for Leak Test
- 6-3.3 Preparation for Leak Test
- 6-3.4 Hydrostatic Leak Test
- 6-3.5 Pneumatic Leak Test
- 6-3.6 Initial Service Leak Test
- 6-3.7 Sensitive Leak Test
- 6-4 RECORDS [Go to Page]
- 6-4.1 Responsibility
- 6-4.2 Retention of Records
- Figures [Go to Page]
- Figure 2-2.3.1-1 Allowable Stress Envelope
- Figure 2-3.3.1-1 Nomenclature for Smooth Radius Elbows
- Figure 2-3.3.2-1 Nomenclature for Mitered Elbows
- Figure 2-3.4.1-1 Detail for Fabricated Branch
- Figure 2-3.4.3-1 Detail for Integrally Molded Tees
- Figure 2-3.5.1-1 Knuckle Reinforcement for Torispherical Closures
- Figure 5-2.5.2-1 Adhesive Joint
- Figure 5-2.5.3-1 Wrapped Joints
- Figure 5-3.1.2.1-1 Assembly Tolerances and Alignment
- Figure 5-3.1.2.4-1 Flange Tolerances
- Figure I-2.3-1 Typical Flange Designs
- Figure I-3.3-1 Design of Flat-Face Integral Flanges
- Figure I-3.3-2 Values of V (Integral Flange Factor)
- Figure I-3.3-3 Values of F (Integral Flange Factor)
- Figure I-3.3-4 Values of f (Hub Stress Correction Factor)
- Figure I-3.3-5 Values of T, U, Y, and Z (Terms Involving K)
- Figure II-2-1 Coordinate System
- Figure II-4-1 In-Place Force Resultants
- Figure II-4-2 Moment Resultants
- Figure II-4-3 Notations for Ply Positions and Laminate Stacking Sequence
- Figure A-5-1 Example Problem Layout
- Figure B-1-1 Alternative Testing Bracket
- Tables [Go to Page]
- Table 2-2.3.6-1 Component Sizes Qualified by Proof-of-Design Testing
- Table 3-2.1-1 Listed Constituent Materials
- Table 3-3.1-1 Temperature Limits for Acceptable Polymeric Materials
- Table 4-1.1-1 Component Specifications
- Table 4-1.1-2 Test Methods and Other Standards
- Table 4-1.1-3 Procurement Information
- Table 4-3.2-1 Visual Inspection Acceptance Criteria
- Table 6-2.2.2-1 Acceptance Criteria for Bonds
- Table I-3.3-1 Flange Factors in Formula Form
- Table A-3.1-1 Guidance to Span Lengths
- Forms [Go to Page]
- Form V-2.2-1 Veil and Mat Reinforcement Log Sheet
- Form V-3.2-1 Roving Reinforcement Log Sheet
- Form V-4.2-1 Fabric Reinforcement Log Sheet
- Form V-5.2-1 Milled Fiber Reinforcement Log Sheet
- Form VI-6-1 Resin Log Sheet
- Form VI-6-2 Curing Agent Log Sheet
- Form VI-7.2-1 Common Additives Log Sheet
- MANDATORY APPENDICES [Go to Page]
- MANDATORY APPENDIX I DESIGN OF INTEGRAL FLAT-FACE FLANGES [Go to Page]
- I-1 SCOPE
- I-2 LIMITATIONS
- I-3 DESIGN OF FLANGES
- MANDATORY APPENDIX II CALCULATION OF PHYSICAL AND MECHANICAL PROPERTIES USING THE LAMINATE ANALYSIS METHOD [Go to Page]
- II-1 SCOPE
- II-2 COORDINATE SYSTEMS
- II-3 DETERMINATION OF LAMINA PROPERTIES
- II-4 CLASSICAL LAMINATION THEORY
- II-5 LAMINA FAILURE PREDICTION
- MANDATORY APPENDIX III STRESS INTENSIFICATION FACTORS, FLEXIBILITY FACTORS, AND PRESSURE STRESS MULTIPLIERS [Go to Page]
- III-1 SCOPE
- III-2 ELBOWS
- III-3 TEES
- III-4 CONCENTRIC REDUCERS
- III-5 FLANGES
- MANDATORY APPENDIX IV SPECIFICATION FOR 55-deg FILAMENT-WOUND GLASS-FIBER-REINFORCED THERMOSETTING-RESIN PIPE [Go to Page]
- IV-1 SCOPE
- IV-2 SAFETY
- IV-3 REFERENCED STANDARDS
- IV-4 TERMINOLOGY
- IV-5 MATERIALS AND MANUFACTURE
- IV-6 LAMINATES
- IV-7 ACCEPTANCE CRITERIA
- IV-8 DIMENSIONS AND TOLERANCES
- IV-9 TEST METHODS
- IV-10 MARKING
- IV-11 CERTIFICATION
- MANDATORY APPENDIX V INSPECTIONS AND TESTING OF REINFORCEMENT MATERIALS [Go to Page]
- V-1 GENERAL
- V-2 FIBERGLASS SURFACING VEIL (MAT), ORGANIC FIBER SURFACING VEIL (MAT), CARBON FIBER VEIL (MAT), AND FIBERGLASS CHOPPED-STRAND MAT
- V-3 FIBERGLASS SPRAY-UP ROVING AND FILAMENT-WINDING ROVING
- V-4 FIBERGLASS WOVEN ROVING FABRIC, FIBERGLASS NONWOVEN BIAXIAL FABRIC, AND FIBERGLASS UNIDIRECTIONAL FABRIC
- V-5 FIBERGLASS MILLED FIBERS
- MANDATORY APPENDIX VI EXAMINATION AND TESTING REQUIREMENTS FOR VINYL ESTER RESIN, POLYESTER RESIN, AND ADDITIVE MATERIALS [Go to Page]
- VI-1 INTRODUCTION
- VI-2 VISUAL INSPECTION
- VI-3 SPECIFIC GRAVITY
- VI-4 VISCOSITY, BROOKFIELD METHOD
- VI-5 ROOM-TEMPERATURE GEL TIME
- VI-6 RESIN AND CURING AGENTS LOG SHEETS
- VI-7 COMMON ADDITIVES
- NONMANDATORY APPENDICES [Go to Page]
- NONMANDATORY APPENDIX A PIPE SUPPORT CALCULATIONS AND SIMPLIFIED STRESS ANALYSIS FOR FRP PIPING SYSTEM DESIGN [Go to Page]
- A-1 SCOPE
- A-2 SUPPORT LOAD CALCULATIONS
- A-3 PIPE SUPPORT AND GUIDE SPACING FOR A SEMIRIGID SYSTEM
- A-4 REFERENCE
- A-5 ANALYSIS EXAMPLE (U.S. CUSTOMARY UNITS)
- NONMANDATORY APPENDIX B ALTERNATIVE TESTING GRIPS AND BRACKETS (MODIFICATION TO ASTM D2105) [Go to Page]
- B-1 USE OF ALTERNATIVE GRIPS AND BRACKETS
- NONMANDATORY APPENDIX C GUIDANCE ON REPAIRS [Go to Page]
- C-1 SCOPE
- C-2 GENERAL CONDITIONS
- C-3 REPAIRS TO CORRECT NONCONFORMITIES
- C-4 CLASSIFICATION OF REPAIRS
- C-5 ORDER OF REPAIRS
- C-6 REPAIR PROCEDURES [Go to Page]