Already a subscriber?
MADCAD.com Free Trial
Sign up for a 3 day free trial to explore the MADCAD.com interface, PLUS access the
2009 International Building Code to see how it all works.
If you like to setup a quick demo, let us know at support@madcad.com
or +1 800.798.9296 and we will be happy to schedule a webinar for you.
Security check
Please login to your personal account to use this feature.
Please login to your authorized staff account to use this feature.
Are you sure you want to empty the cart?
BS EN ISO 24252:2022+A11:2023 Biogas systems. Non-household and non-gasification, 2024
- undefined
- Blank Page [Go to Page]
- European foreword
- Annex A (informative) A–deviations
- Blank Page
- Foreword
- Introduction
- 1 Scope
- 2 Normative references
- 3 Terms and definitions
- 4 Abbreviated terms
- 5 Guide for reading this document
- 6 Safety principles
- 7 Safety studies [Go to Page]
- 7.1 General
- 7.2 Risk assessment and evaluation [Go to Page]
- 7.2.1 Risk assessment construction, start-up and maintenance
- 7.2.2 HAZOP/HAZID
- 7.3 Explosion protection document (EPD)
- 7.4 Environmental requirements
- 8 General design requirements [Go to Page]
- 8.1 Materials and structures [Go to Page]
- 8.1.1 General
- 8.1.2 Materials
- 8.1.3 Structures, weight and stability calculations
- 8.1.4 Use of used materials and equipment
- 8.2 Process system facilities [Go to Page]
- 8.2.1 General
- 8.2.2 Gas-side part of the system
- 8.2.3 Cooling systems
- 8.3 Pressure protection
- 8.4 Safety distances
- 8.5 Electronic monitoring of the process [Go to Page]
- 8.5.1 General
- 8.5.2 Monitoring of the process
- 8.6 Buildings and building services [Go to Page]
- 8.6.1 General
- 8.6.2 Gas detection and electronic monitoring inside buildings
- 8.6.3 Ventilation
- 8.7 Noise protection
- 8.8 Odour prevention
- 8.9 Soil and surface water protection
- 8.10 Condensate and particle removal
- 8.11 Storage of hazardous substances [Go to Page]
- 8.11.1 Storage hazardous substances in general
- 8.12 Facilities at power failure
- 8.13 Air pollution control devices for removal of superfluous biogas (flares, thermal oxidizers gas, etc.)
- 8.14 Unwanted venting and discharges of hazardous gases
- 8.15 Flame protection and mitigation
- 8.16 Fire-fighting and extinguishing
- 8.17 Earthing and lightning protection
- 8.18 Emergency routing
- 8.19 Anti-collision
- 8.20 Access control
- 8.21 Electrical, instrumentation and process control
- 9 Biogas pipelines for untreated biogas [Go to Page]
- 9.1 General
- 9.2 Materials
- 9.3 Civil design
- 9.4 Removal of moisture and contaminants
- 10 Technical specifications and requirements biogas production [Go to Page]
- 10.1 General
- 10.2 Biomass supply and storage
- 10.3 Desulphurization
- 10.4 Biogas buffer
- 10.5 Storage, removal and stabilizing digestate
- 10.6 Specific attention points and requirements landfill sites
- 10.7 Specific requirements additional to Clause 8 [Go to Page]
- 10.7.1 Materials and structures
- 10.7.2 Equipment, pipes, valves and other process system facilities
- 10.7.3 Pressure protection
- 10.7.4 Foam
- 10.7.5 Safety distances
- 10.7.6 Electronic monitoring of the process
- 10.7.7 Buildings and building services
- 10.7.8 Noise protection
- 10.7.9 Soil and surface water protection
- 10.7.10 Condensate and particle removal
- 10.7.11 Storage of hazardous substances
- 10.7.12 Facilities at power failure
- 10.7.13 Air pollution control devices for removal of superfluous biogas (flares, thermal oxidizers gas etc.)
- 10.7.14 Venting
- 10.7.15 Flame protection and mitigation
- 10.7.16 Firefighting and extinguishing
- 10.7.17 Earthing and lightning protection
- 10.7.18 Emergency routing
- 10.7.19 Anti-collision
- 10.7.20 Electrical, instrumentation & process control
- 11 Technical specifications and requirements biogas treatment, CHP, upgrading and liquefaction [Go to Page]
- 11.1 General
- 11.2 Desulphurization
- 11.3 Biogas upgrading and liquefaction
- 11.4 Process system facilities [Go to Page]
- 11.4.1 General
- 11.4.2 Gas-side part of the system
- 11.4.3 Cooling systems
- 11.5 Specific requirements additional to Clause 8 [Go to Page]
- 11.5.1 Materials and structures
- 11.5.2 Pressure protection
- 11.5.3 Safety distances
- 11.5.4 Electronic monitoring of the process
- 11.5.5 Buildings and building services
- 11.5.6 Noise protection
- 11.5.7 Soil protection
- 11.5.8 Condensate and particle removal
- 11.5.9 Storage of hazardous substances
- 11.5.10 Facilities at power failure
- 11.5.11 Air pollution control devices for removal of superfluous biogas (flares, thermal oxidizers gas etc.)
- 11.5.12 Venting
- 11.5.13 Flame protection and mitigation
- 11.5.14 Fire-fighting and extinguishing
- 11.5.15 Earthing and lightning protection
- 11.5.16 Emergency routing
- 11.5.17 Anti-collision
- 11.5.18 Electrical, instrumentation & process control
- 12 Construction and testing [Go to Page]
- 12.1 General
- 12.2 Construction [Go to Page]
- 12.2.1 Safety during construction
- 12.2.2 Prefabrication
- 12.2.3 Construction on site
- 12.3 Testing and commissioning
- 12.4 Start-up
- 12.5 Requirements for commissioning and start-up of specific systems [Go to Page]
- 12.5.1 Biogas production systems
- 12.5.2 Biogas treatment, CHP, upgrading and liquefaction systems
- 13 Operations and maintenance [Go to Page]
- 13.1 General
- 13.2 Supplier of the biogas system
- 13.3 System owner
- 13.4 Emergency plan
- 13.5 Service technician
- 13.6 Requirements for commissioning and start-up of specific systems [Go to Page]
- 13.6.1 Biogas production systems
- 13.6.2 Biogas treatment, CHP, upgrading and liquefaction systems
- 13.7 Requirements for shut-down of biogas system
- Annex A (informative) Explanation to the scope
- Annex B (informative) Biogas characteristics, processes and classifications
- Annex C (informative) Guidelines to prevent risks from gases and explosive atmospheres in buildings
- Bibliography [Go to Page]