ASCE Standard 66: Schedule Delay Analysis, 2017
- Cover
- Copyright
- CONTENTS
- ACKNOWLEDGMENTS
- 1 INTRODUCTION
- 2 SCOPE
- 3 DEFINITIONS
- 4 CRITICAL PATH [Go to Page]
- 4.1 Because the Critical Path Is Dynamic, Delays Should Be Evaluated Based on the Critical Path During
Each Delay
- 4.2 Contemporaneous Schedules Should Be Maintained to Reflect Actual Performance, the Plan to Complete
the Work, and Delay, Should It Occur
- 4.3 Delay Must Be Critical to the Current Adjusted Completion Date for Consideration of a
Time Extension
- 4.4 Delay Should Generally Be Measured by the Change to the Scheduled Completion Date Caused by
the Delay
- 4.5 Excusable Delays Are Typically Events Outside the Contractor’s Control and Entitle the Contractor to a
Time Extension
- 4.6 In Situations Where the Completion Date Is Adjusted Properly for Change Orders and the Contractor Is Behind
Schedule, Owner Delays that Occur Thereafter on a Separate Path May Have a Mitigating Effect on Assessment
of Damages
- 4.7 For a Delay to Be Compensable, It Should Be the Sole Cause of Delay
- 5 FLOAT [Go to Page]
- 5.1 Activities with Float Are Not Critical
- 5.2 Float Is Owned by the Project
- 5.3 Excessive Constraints on Activities that Interfere with a Logic-Driven Critical Path May Complicate Evaluation
of Critical Delays and Should Be Considered in a Delay Analysis
- 5.4 If Multiple Milestones Have Delay Damages Associated with Them, a Separate Delay Analysis Should Be
Performed for Each Milestone
- 6 EARLY COMPLETION [Go to Page]
- 6.1 A Plan to Finish Early Should Be Reasonable
- 6.2 Generally, the Contractor May Be Allowed to Collect Delay Damages to an Early Completion Schedule but
May Not Collect an Excusable Time Extension Until the Scheduled Completion Date Exceeds the Contract
Completion Date
- 7 CHRONOLOGY OF DELAY [Go to Page]
- 7.1 Delays Should Be Evaluated as They Occur in Chronological Sequence
- 7.2 A Schedule Delay Analysis Should Reflect an Analysis of Prior Entitlement so as to Reflect a Current
Adjusted Completion Date Prior to Evaluating Delay
- 7.3 Consideration Should Be Included as to How Delays Were Evaluated by the Participants During
the Project
- 7.4 Evaluation of Delay Chronology Should Be Documented and Supported with Contemporaneous
Records
- 8 CONCURRENT DELAY [Go to Page]
- 8.1 Concurrent Delay Can Be Described as a Situation Where Two or More Critical Delays Are Occurring at the
Same Time During All or a Portion of the Delay Time Frame in Which the Delays Are Occurring
- 8.2 Concurrent Delay Typically Is Excusable but Noncompensable, Meaning a Time Extension Is Given but No
Costs Are Recovered by Either Party
- 8.3 Concurrent Delay Should Be Apportioned Where Possible
- 9 RESPONSIBILITY FOR DELAY [Go to Page]
- 9.1 A Schedule Expert Typically Can Identify the Party Responsible for a Delay from the Contemporaneous
Records, Interviewing Project Personnel, and Reading Deposition Testimony, and May Rely on Technical
Experts or Fact Witnesses in Opining on Liability
- 9.2 During a Project, the Contractor Should Provide the Owner with a Notice of Delay for Excusable Delays,
Followed by a Request for a Change in Accordance with the Contract
- 9.3 Responsibility Analysis Should Be Supported by a Factual Chronology Based on the Contemporaneous Project
Performance Records and Referencing the Remedy-Granting Clause of the Contract
- 9.4 The Schedule Expert Should Attempt to Discuss the Issue with the Individual Directly Involved and Who Has
Factual Knowledge of the Delay Issue, Where Feasible
- 9.5 Schedule Experts Should Not Opine Beyond Their Expertise. If Necessary, a Technical Expert Should Be
Engaged on Whose Opinion the Schedule Expert Can Rely
- 9.6 Once a Technical Expert’s Finding as to Which Party Was Liable for the Delay Event Is Formed, a Legal
Review May Be Made with Counsel Consistent with Legal Precedent in the Project Jurisdiction
- 10 CHANGING SCHEDULES AFTER THE FACT [Go to Page]
- 10.1 The Schedules Should Be Presumed Correct as They Were Used During the Project, Unless Otherwise Shown
to Be Inaccurate
- 10.2 After-the-Fact Changes to Schedules Used During the Project Should Be Minimized and Only Made Where
Necessary
- 10.3 Any Changes Made to the Contemporaneous Record of Project Schedules Should Be Carefully Identified and
Documented
- 10.4 When Possible, the Preference for Dealing with Inaccurate Schedules After the Fact Is to Make Corrections,
Rather than Abandon the Schedules, Subject to the Nature and Scope of the Corrections
- 10.5 Changes to Schedules Generally May Be Made to Correct Necessary Physical or Contractual Constraints but
Typically Not the Contractor’s Preferential Sequencing
- 11 ACCELERATION [Go to Page]
- 11.1 Parties Have the Right to Voluntarily Accelerate, Subject to Contract Terms and Conditions
- 11.2 For Owner-Directed Acceleration, the Parties Should Agree on the Acceleration Plan Prior to Implementation.
The Right to Direct Acceleration Unilaterally Should Be Addressed by Contract
- 11.3 Constructive Acceleration Can Be Proved
- 11.4 When Implementing an Acceleration Plan, Acceleration of Multiple Paths in the Schedule May
Be Required
- 12 REFERENCES
- INDEX [Go to Page]